FISCAL YEAR |
 |
EST. BID PERIOD |
 |
TRADE |
 |
FMS ID |
 |
DESCRIPTION |
 |
BUDGET RANGE (X $1000) |
| 1 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
CONISPH01 |
 |
INSTALL STORM AND SANITARY SEWERS, AND TRUNK AND DISTRIBUTION WATER MAINS -- CONEY ISLAND AREA, BROOKLYN |
 |
Over 10 mil |
| 2 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
HD161C |
 |
ROADWAY RECONSTRUCTION, INCLUDING SANITARY AND STORM SEWERS, WATER MAIN, TRAFFIC MANAGEMENT AND STREET LIGHTING: GATEWAY ESTATES AREA OF EAST NEW YORK, BROOKLYN |
 |
Over 10 mil |
| 3 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
HL82CHELI |
 |
INTERIOR AND EXTERIOR RENOVATIONS |
 |
Over 10 mil |
| 4 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
HL82SIABEX |
 |
RENOVATION AND EXPANSION OF THE S.I. ANIMAL SHELTER INCLUDING NEW ELECTRICAL, PLUMBING AND VENTILATION SYSTEMS. THIS PROJECT IS TARGETED FOR LEED SILVER CERTIFICATION. |
 |
2500-5000 |
| 5 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
HW2CR13CW |
 |
MILLING OF STREETS CITYWIDE IN PREPARATION FOR RESURFACING BY DOT ROADWAY REPAIR AND MAINTENANCE (RRM) DIVISION |
 |
Over 10 mil |
| 6 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
HW349FED |
 |
ROADWAY RESURFACING WITH 2 ASPHALT/CONCRETE WEARING COURSE, INSTALLATION OF PEDESTRIAN RAMPS AT DESIGNATED STREETS, AND INSTALLATION OF NEW CURBS AND SIDEWALKS WHERE DIRECTED |
 |
Over 10 mil |
| 7 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
HWC988QB4 |
 |
IMPLEMENT PEDESTRIAN SAFETY AND TRAFFIC FLOW IMPROVEMENTS AT 12 INTERSECTIONS ALONG QUEENS BOULEVARD BETWEEN 32ND PLACE AND 65TH PLACE |
 |
1000-2500 |
| 8 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
HWK1130A |
 |
INSTALL BUS RAPID TRANSIT (BRT) STATIONS WITH FULL ROADWAY RECONSTRUCTION ON THESE BLOCKS AT THE FOLLOWING LOCATIONS: NOSTRAND AVENUE (SOUTH BOUND) FROM FLUSHING TO FLATBUSH AVENUE; BEDFORD AVENUE (NORTH BOUND) FROM FLUSHING TO ROGERS AVENUE; ROGERS AVENUE (NORTH BOUND) FROM BEDFORD TO FLATBUSH AVENUE |
 |
Over 10 mil |
| 9 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
HWP2012QC |
 |
INSTALL PEDESTRIAN RAMPS AT VARIOUS LOCATIONS IN QUEENS |
 |
5000-10000 |
| 10 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
HWPLZ005K |
 |
CONSTRUCT A NEW PUBLIC PLAZA AND STREETSCAPE |
 |
1000-2500 |
| 11 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
HWPLZ006K |
 |
RECONSTRUCT PUBLIC PLAZA |
 |
1000-2500 |
| 12 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
HWQ1182A |
 |
INSTALL BULKHEADS AT THE END OF WEST 11TH, 12TH AND 13TH ROADS, AND PERFORM ROADWAY RECONSTRUCTION FROM THE NEW BULKHEADS BACK TO CROSS BAY BOULEVARD. THIS PROJECT INCLUDES INSTALLATION OF ONE-WAY STORM WATER DRAIN VALVES TO DECREASE THE FREQUENCY, SEVERITY AND DURATION OF FLOODING IN THIS LOW LYING AREA. |
 |
5000-10000 |
| 13 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
HWQF027C |
 |
CONSTRUCT A NEW DIESEL FUELING STATION PLUS INSTALL AN EXHAUST CAPTURE SYSTEM, UPGRADES TO ELECTRICAL EQUIPMENT, FLOOR LEVELING AND ROOF REPLACEMENT |
 |
5000-10000 |
| 14 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
HWXD203 |
 |
INSTALL NEW SIDEWALK ALONG BOSTON ROAD, INLAYED WITH MOSAICS DEPICTING ZOO ANIMALS |
 |
250-500 |
| 15 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
LBCA06SPK |
 |
UPGRADE TECHNOLOGY FOR ENHANCED LIBRARY SERVICES |
 |
1000-2500 |
| 16 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
MED598 |
 |
INSTALL TRUNK WATER MAIN, CONNECTING CITY TUNNEL #3 TO THE DISTRIBUTION SYSTEM: 9TH AND 10TH AVENUES FROM 29TH TO 31ST STREETS, AND THE INTERVENING BLOCKS OF 29TH, 30TH AND 31ST STREETS |
 |
Over 10 mil |
| 17 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PO79FDESK |
 |
DEIGN AND CONSTRUCTION OF FRONT DESKS FOR NYPD PRECINCTS |
 |
500-1000 |
| 18 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV022HVAC |
 |
RENOVATION OF THE COSTUME INSTITUTE GALLERIES INCLUDING REFURBISHING THE HVAC AND RELATED CONTROLS |
 |
5000-10000 |
| 19 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV205LIB1 |
 |
RENOVATIONS TO LIBRARY AND UPGRADE TO HVAC SYSTEM |
 |
2500-5000 |
| 20 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV262-RT |
 |
RENOVATE EXISTING ROOF AREA TO INCLUDE A CANOPY COVERED MULTI-USE COMMUNITY SPACE PLUS UPGRADES TO THE COMMONS THEATRE AND FIRST FLOOR PUBLIC RESTROOMS |
 |
2500-5000 |
| 21 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV419-CAR |
 |
COMPLETE RENOVATION OF PREMISES |
 |
2500-5000 |
| 22 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV466CRLB |
 |
REHABILITATE ORIGINAL CIRCULAR LOBBY
|
 |
1000-2500 |
| 23 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV467-122 |
 |
RENOVATE BUILDING SYSTEMS INCLUDING ELEVATOR, FIRE DETECTION/SPRINKLER, ELECTRICAL; INSTALL PARTITIONS; IMPROVE EGRESS ROUTES |
 |
Over 10 mil |
| 24 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV467ANYC |
 |
DESIGN AND CONSTRUCTION SERVICES FOR THEATER AND ANCILLARY PROGRAM SPACE FOR THE ALLIANCE OF RESIDENT THEATRES/NEW YORK (ART/NY) ON WEST 53RD STREET IN MANHATTAN. THIS PROJECT INCLUDES A PERCENT FOR ART COMPONENT. |
 |
Over 10 mil |
| 25 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV467ANYC |
 |
DESIGN AND CONSTRUCTION SERVICES FOR THEATER AND ANCILLARY PROGRAM SPACE FOR THE ALLIANCE OF RESIDENT THEATRES/NEW YORK (ART/NY) ON WEST 53RD STREET IN MANHATTAN. THIS PROJECT INCLUDES A PERCENT FOR ART COMPONENT. |
 |
Over 10 mil |
| 26 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV467-CRG |
 |
INITIAL CONSTRUCTION ON FACILITIES FOR THE MANHATTAN CLASS COMPANY (MCC) THEATER, LOCATED ON THE GROUND AND SECOND FLOORS IN THE ARCHSTONE CLINTON DEVELOPMENT ON 10TH AVENUE IN HELLS KITCHEN. THE SPACE WILL INCLUDE TWO THEATERS, DRESSING ROOMS, ADMINISTRATIVE OFFICES, AND REHEARSAL AND MEETING AREAS. |
 |
Over 10 mil |
| 27 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV467GUG4 |
 |
RENOVATIONS AND LIGHTING SYSTEM IMPROVEMENTS AT THE GUGGENHEIM GALLERY |
 |
500-1000 |
| 28 |
 |
2012 |
 |
Jan 01 - Mar 31 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV467IRT1 |
 |
DESIGN AND CONSTRUCTION SERVICES FOR THEATER AND ANCILLARY PROGRAM SPACE FOR THE ALLIANCE OF RESIDENT THEATRES/NEW YORK (ART/NY) ON WEST 53RD STREET IN MANHATTAN. THIS PROJECT INCLUDES A PERCENT FOR ART COMPONENT. |
 |
1000-2500 |
| 29 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV467LIN |
 |
DEMOLISH EXISTING BODY SHOP ON SITE, RE-GRADE LOT, DESIGN AND PAVE LOT TO PROVIDE APPROXIMATELY 60 SPACES AS WELL AS BICYCLE PARKING PER CODE; PROVIDE NEW LIGHTING, SECURITY EQUIPMENT, LANDSCAPING, AND FENCE/GATE |
 |
500-1000 |
| 30 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV467SCUL |
 |
INSTALL FIRE SAFETY SYSTEM IN THE CELLAR AND ADD EXTERIOR STAIRWAY FROM THE CELLAR INTO THE COURTYARD |
 |
500-1000 |
| 31 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV467THEA |
 |
UPGRADE INTERIOR AND EXTERIOR OF FLUSHING TOWN HALL |
 |
500-1000 |
| 32 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV490-FH |
 |
INTERIOR AND EXTERIOR RENOVATIONS TO PROVIDE ADA ACCESS; A CATERING KITCHEN AND FACILITIES; ART STUDIO; CONSERVATION LABORATORY AND EXHIBITION SPACES WITH A MUSEUM QUALITY HVAC SYSTEM |
 |
Over 10 mil |
| 33 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV503MST2 |
 |
STRUCTURAL WORK AT THE CARNEGIE HALL TOWERS |
 |
2500-5000 |
| 34 |
 |
2012 |
 |
Jan 01 - Mar 31 |
 |
Plumbing, HVAC, Elec, GC |
 |
PVCIHVAC |
 |
UPGRADE HVAC SYSTEM FOR ENTIRE BUILDING |
 |
500-1000 |
| 35 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PVDOWNALP |
 |
GUT REHABILITATION, INCLUDING NEW FAÇADE, OF BUILDING AT 70 EAST 4TH STREET. THIS PROJECT IS TARGETED TO ACHIEVE LEED CERTIFICATION. |
 |
2500-5000 |
| 36 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PW348-54 |
 |
REPLACE AGING FUEL TANKS AT APPROXIMATELY 60 LOCATIONS |
 |
Over 10 mil |
| 37 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PWD005NEW |
 |
CONVERT OLD FIREHOUSE TO OFFICES AND TRAINING ROOM. WORK ALSO INCLUDES EXTERIOR ENVELOPE REPAIRS, WINDOW REPLACEMENT, MAKING FIRST FLOOR RESTROOM ADA COMPLIANT. |
 |
1000-2500 |
| 38 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PWD5SHOR |
 |
NEW EXTERIOR LIGHT FIXTURES, POLES |
 |
500-1000 |
| 39 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
QED989 |
 |
REPLACE WATER MAINS AT VARIOUS LOCATIONS THROUGHOUT QUEENS |
 |
Over 10 mil |
| 40 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
SE-GUN-14 |
 |
EMERGENCY REHABILITATION OF SANITARY AND COMBINED SEWERS BY USING SHOTCRETE METHOD, IN VARIOUS LOCATIONS, CITYWIDE |
 |
5000-10000 |
| 41 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
SE-LC-16 |
 |
EMERGENCY LINING CONTRACT, CITYWIDE |
 |
2500-5000 |
| 42 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
SER200238 |
 |
REPLACE STORM AND SANITARY SEWERS, INSTALL NEW EXTENSIONS: CUBA AVENUE AND VICINITY, STATEN ISLAND |
 |
5000-10000 |
| 43 |
 |
2012 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
TAVREH |
 |
DESIGN AND CONSTRUCTION OF EXTERIOR RENOVATION TO RETURN THIS LANDMARKED STRUCTURE TO THE ORIGINAL 1940'S FOOTPRINT INCLUDING: REMOVAL OF NON-HISTORIC BUILDING ADDITIONS; RESTORATION OF HISTORIC FACADE; REPLACEMENT OF SLATE ROOFS; REPLACEMENT OF EXISTING MECHANICAL/ELECTRICAL/PLUMBING SYSTEMS PROVIDING ROUGH-INS FOR KITCHEN AND BATHROOMS |
 |
Over 10 mil |
| 44 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
EP6-KENTD |
 |
PERFORM A FULL FUNCTIONAL UPGRADE OF THE INTERIOR AND EXTERIOR OF THIS CENTURY OLD STRUCTURE, PROVIDING ALL NEW BUILDING SYSTEMS. THE DESIGN WILL INCLUDE ADA COMPLIANCE, AND LEED AND HISTORIC PRESERVATION STANDARDS. |
 |
Over 10 mil |
| 45 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
F175AF292 |
 |
REPLACE APPARATUS FLOOR AND PERFORM OTHER BUILDING UPGRADES |
 |
1000-2500 |
| 46 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
F175AFE60 |
 |
APPARATUS FLOOR REPLACEMENT; ADA BATHROOM INSTALLATION AND RELATED PLUMBING; MECHANICAL AND ELECTRICAL WORK |
 |
1000-2500 |
| 47 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
GE351 |
 |
RELOCATION AND REPLACEMENT OF BROKEN WATER MAINS, ON AN EMERGENCY BASIS, CITYWIDE |
 |
Over 10 mil |
| 48 |
 |
2013 |
 |
Oct 01 - Dec 31 |
 |
Construction |
 |
HBPED100Q |
 |
DEMOLISH AND REPLACE THREE PEDESTRIAN BRIDGES, MANHATTAN AND QUEENS |
 |
Over 10 mil |
| 49 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HBPED700Q |
 |
RECONSTRUCT OR REHABILITATE PASSERELLE OVERPASS IN FLUSHING MEADOWS -- CORONA PARK |
 |
1000-2500 |
| 50 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HED564 |
 |
INSTALL NEW 20 SUB-AQUEOUS WATER MAIN ON CITY ISLAND ROAD BETWEEN PARK ROAD AND CITY ISLAND AVENUE |
 |
Over 10 mil |
| 51 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HED568 |
 |
INSTALL NEW 20 SUB-AQUEOUS WATER MAIN EXTENSION TO RANDALL'S ISLAND CONNECTING TO A 36 MAIN AT ST. ANN'S AVE AND BRUCKNER BOULEVARD IN THE BRONX |
 |
2500-5000 |
| 52 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
HR25FACA |
 |
EXTERIOR ENVELOPE REHABILITATION |
 |
2500-5000 |
| 53 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
HW2CR13A |
 |
MILLING OF STREETS IN BROOKLYN AND STATEN ISLAND IN PREPARATION FOR RESURFACING BY DOT HIGHWAY OPERATIONS |
 |
Over 10 mil |
| 54 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWC988M2 |
 |
RECONSTRUCT ROADWAY |
 |
1000-2500 |
| 55 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWD105-03 |
 |
ROADWAY RECONSTRUCTION: COLES LANE FROM EAST KINGSBRIDGE ROAD TO BAINBRIDGE AVENUE |
 |
2500-5000 |
| 56 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWK1048A |
 |
RECONFIGURATION OF WEST STREET FROM EAGLE TO QUAY STREET, INCLUDING A TWO-WAY, CLASS 1 SEPARATED BIKE PATH; PLANTED BUFFER, SPEED TABLES AND IMPROVED PAVEMENT MARKINGS AT INTERSECTIONS; PLUS UNDERGROUND RELOCATION EXISTING ABOVEGROUND UTILITIES |
 |
5000-10000 |
| 57 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWK1048B |
 |
RECONFIGURATION OF FLUSHING AVENUE FROM NAVY STREET TO WILLIAMSBURG STREET, TO INCLUDE: A TWO-WAY, CLASS 1 SEPARATED BIKE PATH; A SIX FOOT SIDEWALK EXTENSION; IMPROVED PAVEMENT MARKINGS AT ALL INTERSECTIONS |
 |
5000-10000 |
| 58 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWK300-01 |
 |
RECONSTRUCT NORTH FLATBUSH AVENUE FROM ATLANTIC AVENUE TO GRAND ARMY PLAZA, TO INCLUDE GREEN TRIANGLE STREETSCAPES WITH TRAFFIC NECKDOWNS AT INTERSECTIONS WITH CARLTON AVENUE AND PARK PLACE; 7TH AVENUE AND PARK PLACE; 6TH AVENUE AND ST. MARKS AVENUE; 8TH AVENUE AND ST. MARKS PLACE, PLUS ADDITIONAL NECKDOWNS AT BERGEN STREET; PROSPECT PLACE AND STERLING PLACE |
 |
2500-5000 |
| 59 |
 |
2013 |
 |
Oct 01 - Dec 31 |
 |
Plumbing, HVAC, Elec, GC |
 |
HWKF2007 |
 |
UPGRADE EQUIPMENT AT THE HAMILTON AVENUE ASPHALT PLANT IN BROOKLYN |
 |
5000-10000 |
| 60 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWKKP005 |
 |
RESTORE HISTORIC BELGIAN BLOCK ROADWAYS IN DUMBO AND VINEGAR HILL, AND CONSTRUCT THE NEW PEARL STREET PLAZA |
 |
Over 10 mil |
| 61 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWKP2027 |
 |
RECONSTRUCT SIDEWALKS AND TRAFFIC NECKDOWNS ALONG CHURCH AVENUE IN BROOKLYN |
 |
2500-5000 |
| 62 |
 |
2013 |
 |
Oct 01 - Dec 31 |
 |
Construction |
 |
HWM215 |
 |
RECONSTRUCT THE STEP STREET AT WEST 215TH STREET BETWEEN BROADWAY AND PARK TERRACE EAST |
 |
2500-5000 |
| 63 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWMBRT5A |
 |
IMPLEMENT TRANSITWAY ELEMENTS ALONG 34TH STREET FROM 5TH AVENUE TO THE FDR DRIVE, WHICH INCLUDE CONSTRUCTION OF MEDIAN ISLANDS AND TRAFFIC NECKDOWNS TO ESTABLISH A SEPARATE RIGHT OF WAY FOR BUSES. DEP WORK: TRUNK WATER MAIN AND DISTRIBUTION WATER MAIN REPLACEMENT IN E34TH ST. BETWEEN 1ST AVE. AND 3RD AVE. |
 |
Over 10 mil |
| 64 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
HWMP116 |
 |
STREET RECONSTRUCTION AND RECONFIGURATION, INCLUDING THE EXPANSION OF COOPER PARK AND CREATION OF NEW PEDESTRIAN PLAZAS |
 |
Over 10 mil |
| 65 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
HWMP2012 |
 |
STREET RECONSTRUCTION, INCLUDING SEWER AND WATER MAIN WORK |
 |
Over 10 mil |
| 66 |
 |
2013 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
HWMP2017 |
 |
ROADWAY RECONSTRUCTION: WADSWORTH TERRACE FROM FAIRVIEW AVENUE TO WEST 190TH STREET, MANHATTAN |
 |
2500-5000 |
| 67 |
 |
2013 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
HWMP2020 |
 |
STREET RECONSTRUCTION WITH ENHANCED SIDEWALKS AND CROSSINGS: NINTH AVENUE FROM GANSEVROOT TO WEST 16TH STREET, PLUS GANSEVROOT FROM NINTH AVENUE TO HUDSON STREET AND A SECTION OF HUDSON NEAR WEST 14TH STREET. THE PROJECT IS BORDERED BY THE CHELSEA AND GANSEVROOT MARKET HISTORIC DISTRICTS ON THE NORTH AND SOUTH, RESPECTIVELY. |
 |
Over 10 mil |
| 68 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
HWMWTCA6A |
 |
RECONSTRUCT ROADWAY; REPLACE WATER MAIN; REHABILITATE SEWERS: SECTIONS OF BROADWAY AND ADJOINING STREETS SOUTH OF FULTON |
 |
Over 10 mil |
| 69 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWMWTCA7E |
 |
ROADWAY RECONSTRUCTION: WORTH STREET FROM HUDSON STREET TO PARK ROW, INCLUDING SIDEWALK, CURB, SEWER AND WATER MAIN WORK |
 |
Over 10 mil |
| 70 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWPEDSF3 |
 |
DESIGN AND IMPLEMENT ROADWAY AND SIDEWALK TREATMENTS TO ENHANCE PEDESTRIAN SAFETY |
 |
5000-10000 |
| 71 |
 |
2013 |
 |
Oct 01 - Dec 31 |
 |
Construction |
 |
HWPLZ001K |
 |
CONSTRUCT A NEW PUBLIC PLAZA AND STREETSCAPE |
 |
5000-10000 |
| 72 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
HWPLZ004M |
 |
ROADWAY RECONSTRUCTION, IN CONJUNCTION WITH WATER MAIN REPLACEMENT, TO CREATE A PEDESTRIAN PLAZA ON THE WEST SIDE OF PARK AVENUE BETWEEN 41ST AND 42ND STREETS, ADJACENT TO THE VIADUCT |
 |
2500-5000 |
| 73 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWPLZ008M |
 |
CONSTRUCTION OF THE PLAZA ALONG FORSYTH STREET FROM CANAL TO DIVISION STREET, TO INCLUDE THE CREATION OF A PLAZA ON THE UPPER LEVEL OF THE MANHATTAN BRIDGE |
 |
1000-2500 |
| 74 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWPLZ009K |
 |
RECONSTRUCT AND EXPAND NEW LOTS TRIANGLE INCLUDING NEW LOTS AVENUE FROM ASHFORD STREET TO LIVONIA AVENUE, LIVONIA FROM ASHFORD TO NEW LOTS AND ASHFORD FROM LIVONIA TO NEW LOTS |
 |
1000-2500 |
| 75 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWPLZ009M |
 |
STREET RECONSTRUCTION, 175TH STREET BETWEEN BROADWAY AND WADSWORTH AVENUE, TO CREATE A PEDESTRIAN PLAZA WITH AMENITIES INCLUDING TREES, PLANTINGS, LIGHTING AND BENCHES |
 |
2500-5000 |
| 76 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWQ411B |
 |
STREET RECONSTRUCTION IN AREA INCLUDED IN 135TH AVENUE AND LINDEN BOULEVARD SOUTH TO ALBERT ROAD AND NORTH CONDUIT AVENUE, AND BOUNDED BY CROSS BAY BOULEVARD TO THE WEST AND THE RAILROAD RIGHT-OF-WAY ALONG AQUEDUCT RACE TRACK TO THE EAST |
 |
Over 10 mil |
| 77 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWQ985 |
 |
ENGINEERED RESURFACING OF SHORE ROAD FROM WEST DRIVE TO 36TH AVENUE IN DOUGLAS MANOR, DOUGLASTON, QUEENS |
 |
5000-10000 |
| 78 |
 |
2013 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
HWR00504 |
 |
ROADWAY IMPROVEMENT AT VICTORY BOULEVARD AND CLOVE ROAD, WHICH INCLUDES WIDENING THE INTERSECTION AND ADDING LEFT AND RIGHT TURN LANES |
 |
2500-5000 |
| 79 |
 |
2013 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
HWR00505 |
 |
ROADWAY IMPROVEMENT AT THE INTERSECTION OF VICTORY BOULEVARD AND MANOR ROAD |
 |
2500-5000 |
| 80 |
 |
2013 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
HWR00507 |
 |
RECONSTRUCT AND WIDEN BRADLEY AVENUE AND WILLOWBROOK ROAD, INCLUDING REPLACEMENT OF SIDEWALKS ON BOTH SIDES OF THE STREET, PEDESTRIAN RAMPS, TRAFFIC SIGNALS, STREET LIGHTING AND RELATED ROADWAY WORK IN THE BOROUGH OF STATEN ISLAND |
 |
1000-2500 |
| 81 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWR00508 |
 |
WIDEN ROADWAY AND PERFORM RELATED WORK: AMBOY ROAD BETWEEN RICHMOND AND ARMSTRONG AVENUES |
 |
5000-10000 |
| 82 |
 |
2013 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
HWR005B1 |
 |
IMPLEMENT MEASURES TO IMPROVE TRAFFIC FLOW: INTERSECTION OF TODT HILL AND CIRCLE ROADS |
 |
500-1000 |
| 83 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWRC055 |
 |
IMPROVE TRAFFIC MOVEMENT BY WIDENING THE ROADWAY, INSTALLING LEFT TURN BAYS AND RESURFACING THE INTERSECTION |
 |
1000-2500 |
| 84 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWSRT200A |
 |
INSTALL NEW SIDEWALKS WITH EXTENSIONS AT BUS STOPS UNDER ELEVATED TRAIN LINES TO IMPROVE ACCESS AND ELIMINATE MID-ROADWAY BUS LOADING -- MULTIPLE LOCATIONS IN THE BRONX AND IN QUEENS |
 |
2500-5000 |
| 85 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWSRT200B |
 |
INSTALL NEW SIDEWALKS WITH EXTENSIONS AT BUS STOPS UNDER ELEVATED TRAIN LINES TO IMPROVE ACCESS AND ELIMINATE MID-ROADWAY BUS LOADING -- MULTIPLE LOCATIONS IN THE BRONX AND IN QUEENS |
 |
1000-2500 |
| 86 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWX710A |
 |
RECONSTRUCT PELHAM PARKWAY FROM THE BRONX RIVER PARKWAY TO THE HUTCHINSON RIVER PARKWAY, INCLUDING THE NORTH SERVICE ROAD FROM BRONX PARK EAST TO EASTCHESTER ROAD |
 |
Over 10 mil |
| 87 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWXFPLZ |
 |
ROADWAY REALIGNMENT, TRAFFIC RECONFIGURATION AND STREET IMPROVEMENT AT FORDHAM PLAZA: THE AREA BOUNDED BY FORDHAM ROAD, 3RD AVENUE, PARK AVENUE AND 189TH STREET |
 |
Over 10 mil |
| 88 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWXP093B |
 |
STREET RECONSTRUCTION, BOLLER AVENUE FROM CROMFORD AVENUE TO BOSTON ROAD |
 |
1000-2500 |
| 89 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWXP136A |
 |
RECONSTRUCT GRAND CONCOURSE SERVICE ROADS BETWEEN EAST 166TH AND EAST 171ST STREETS. INCLUDES WIDENING OF MEDIAN, INSTALLATION OF BICYCLE LANES AND LANDSCAPING. |
 |
Over 10 mil |
| 90 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWXP2007 |
 |
RECONSTRUCT ADJOINING SECTIONS OF EAST 177TH STREET, DEVOE AVENUE AND EAST TREMONT AVENUE, FROM BRONX PARK AVENUE TO BOSTON ROAD |
 |
Over 10 mil |
| 91 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
HWXS311V1 |
 |
REHABILITATE CLIFFORD PLACE STEP STREET
|
 |
2500-5000 |
| 92 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
LBC09SWCN |
 |
RENOVATIONS INCLUDING HVAC IMPROVEMENTS |
 |
2500-5000 |
| 93 |
 |
2013 |
 |
Oct 01 - Dec 31 |
 |
Plumbing, HVAC, Elec, GC |
 |
LNCA0996S |
 |
PERFORM EXTERIOR RENOVATIONS |
 |
250-500 |
| 94 |
 |
2013 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
LNCA10AGL |
 |
RESTORE LANDMARK BUILDING FAÇADE |
 |
500-1000 |
| 95 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Plumbing, HVAC, Elec, GC |
 |
LNCA10JMB |
 |
RENOVATION WORK FOR ADA COMPLIANCE INCLUDING RECONFIGURATION OF THE 10TH STREET ENTRANCE, RECONFIGURATION OF EXISTING REST ROOMS AND THE ADDITION OF A NEW ONE |
 |
2500-5000 |
| 96 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
LNCA11SNV |
 |
THE SCOPE INCLUDES RENOVATION OF THE COMMUNITY ROOM, NEW ELECTRICAL AND DATA WIRING, IMPROVED ENTRANCE SECURITY, NEW BOOK DROP AND NEW FENCING. |
 |
250-500 |
| 97 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
LNEMA08WS |
 |
INTERIOR RENOVATION AND ADA COMPLIANCE |
 |
5000-10000 |
| 98 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Plumbing, HVAC, Elec, GC |
 |
LNRA10STG |
 |
BOILER REPLACEMENT AND ELEVATOR UPGRADE |
 |
500-1000 |
| 99 |
 |
2013 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
LNXA11WFM |
 |
PERFORM RENOVATION WORK ON MAIN ENTRYWAY TO MEET ADA COMPLIANCE -- INCLUDES ADDITION OF POWER ASSISTED EXTERIOR AND INTERIOR VESTIBULE DOORS
|
 |
250-500 |
| 100 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
LQD122-QW |
 |
A NEW STATE OF THE ART BRANCH LIBRARY WITH SPACE PROVIDED FOR THE NEW YORK STATE PARKS DEPARTMENT. THE PARKS FACILITY WILL HOUSE PUBLIC RESTROOMS, PARK RANGER AND POLICE OFFICES, RECEPTION AND CONFERENCE ROOMS, AND STORAGE AREAS. |
 |
2500-5000 |
| 101 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Plumbing, HVAC, Elec, GC |
 |
LQD122RO2 |
 |
HVAC SYSTEM REPLACEMENT AND CONTROLS AT THE ROCHDALE VILLAGE COMMUNITY LIBRARY |
 |
250-500 |
| 102 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
LQQ122EE2 |
 |
EXPANSION OF EXISTING COMMUNITY LIBRARY |
 |
2500-5000 |
| 103 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
LRCA08SCH |
 |
REHABILITATION WORK INCLUDING: ROOF AND SIDEWALK REPLACEMENT, FIRE ALARM SYSTEM UPGRADES AND MAJOR INTERIOR RENOVATIONS WITH TECHNOLOGY UPGRADES FOR NEW COMPUTERS |
 |
5000-10000 |
| 104 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Plumbing, HVAC, Elec, GC |
 |
LREM12SCH |
 |
ELEVATOR REPLACEMENT |
 |
250-500 |
| 105 |
 |
2013 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
MED598B |
 |
INSTALL TRUNK WATER MAINS IN WEST 29TH, 30TH AND 31ST STREETS BETWEEN 9TH AND 10TH AVENUES, INCLUDING ADJACENT SECTIONS OF 9TH AND 10TH AVENUES, TO CONNECT SHAFT 26B OF CITY TUNNEL #3 TO THE DISTRIBUTION SYSTEM. THIS PROJECT INCLUDES COMBINED SEWER WORK IN THE 10TH AVENUE SEGMENT. |
 |
Over 10 mil |
| 106 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
MED600B |
 |
INSTALL TRUNK WATER MAIN AT VARIOUS LOCATIONS ALONG 59TH STREET, CONNECTING THIRD WATER TUNNEL SHAFT 33B TO THE DISTRIBUTION SYSTEM |
 |
Over 10 mil |
| 107 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
MED625 |
 |
INSTALL/REPLACE DISTRIBUTION WATER MAIN EXTENSIONS FOR NEW BUILDINGS |
 |
2500-5000 |
| 108 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PO79BMADS |
 |
REPLACEMENT OF ENTIRE ROOF |
 |
5000-10000 |
| 109 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PO79-FSUP |
 |
INSTALL FIRE SUPPRESSION SYSTEMS FOR FUELING STATIONS AT 23 POLICE PRECINCTS LOCATED IN QUEENS, THE BRONX, AND STATEN ISLAND |
 |
1000-2500 |
| 110 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV175AQUA |
 |
REPLACE AQUARIUM TANKS WITH ONES THAT ARE LARGER AND MORE ACCESSIBLE, AND PROVIDE SPACES FOR INTERACTIVE EXHIBITS AND OTHER EDUCATIONAL ACTIVITIES |
 |
1000-2500 |
| 111 |
 |
2013 |
 |
Oct 01 - Dec 31 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV256-FRI |
 |
FACILITY UPGRADES TO INCLUDE: HVAC EQUIPMENT REPLACEMENT; BACKSTAGE INFRASTRUCTURE IMPROVEMENTS WITH NEW STORAGE AREAS; ELECTRICAL UPGRADES; AND, BUDGET PERMITTING, EXTERIOR CURB AND SIDEWALK IMPROVEMENTS. |
 |
500-1000 |
| 112 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV272-ENT |
 |
IMPROVE ACCESS AND SECURITY AT MAIN ENTRANCES, INCLUDING LANDSCAPING AND LIGHTING |
 |
5000-10000 |
| 113 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV272PATH |
 |
CONSTRUCT GARDEN WIDE PEDESTRIAN PATHWAY FOR QUEENS BOTANICAL GARDEN INCLUDING ASSOCIATED LANDSCAPE ARCHITECTURE |
 |
2500-5000 |
| 114 |
 |
2013 |
 |
Oct 01 - Dec 31 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV274EXLT |
 |
INSTALL EXTERIOR LIGHTING AND SECURITY CAMERAS FOR THE SCIENCE PLAYGROUNDS, ROCKET MINI-GOLF COURSE AND ROCKET PARK |
 |
1000-2500 |
| 115 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV341BRIT |
 |
ASSESS RELATIVE MERITS OF PRESERVATION, RESTORATION, RECONSTRUCTION AND/OR REHABILITATION OF THIS THE OLDEST EXTANT HOUSE IN STATEN ISLAND IN ORDER TO PREPARE CONSTRUCTION DOCUMENTS FOR WORK WHICH WILL BEST MEET THE NEEDS OF CURRENT VISITORS AND STAFF AND OF FUTURE GENERATIONS |
 |
500-1000 |
| 116 |
 |
2013 |
 |
Oct 01 - Dec 31 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV467-BHT |
 |
COMPREHENSIVE REHABILITATION OF THEATRE BUILDING AND SYSTEMS
|
 |
1000-2500 |
| 117 |
 |
2013 |
 |
Oct 01 - Dec 31 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV467-POP |
 |
INSTALL ELEVATOR AND PROVIDE ADA COMPLIANT RESTROOM FACILITY |
 |
1000-2500 |
| 118 |
 |
2013 |
 |
Apr 01 - Jun 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV467-STG |
 |
IMPROVEMENTS INCLUDE REMOVAL AND REPLACEMENT OF THEATER MARQUEE; INSTALLATION OF NEW RIGGING SYSTEM WITH STRUCTURAL REINFORCEMENT OF THE ROOF; UPGRADE FIRE ALARM AND SPRINKLER SYSTEMS WITH ENHANCEMENTS TO ELECTRICAL AND PLUMBING SYSTEMS |
 |
1000-2500 |
| 119 |
 |
2013 |
 |
Oct 01 - Dec 31 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV490SITE |
 |
UPGRADE THE SNUG HARBOR SITE PLAN; DESIGN IMMEDIATE NEED IMPROVEMENTS |
 |
5000-10000 |
| 120 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Plumbing, HVAC, Elec, GC |
 |
PVC341-M |
 |
UTILITY UPGRADES AND IMPROVEMENTS TO THE CENTER STREET MUSEUM BUILDINGS |
 |
5000-10000 |
| 121 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PW80DYCD2 |
 |
INTERIOR GUT RENOVATION |
 |
Over 10 mil |
| 122 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Plumbing, HVAC, Elec, GC |
 |
PWD5SOUTH |
 |
NEW GRANDSTAND |
 |
1000-2500 |
| 123 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
QED1001 |
 |
WATER MAIN REPLACEMENT AT NUMEROUS LOCATIONS IN QUEENS |
 |
Over 10 mil |
| 124 |
 |
2013 |
 |
Oct 01 - Dec 31 |
 |
Construction |
 |
QED1002 |
 |
WATER MAIN WORK AT MULTIPLE LOCATIONS: QUEENS COMMUNITY BOARD 6 |
 |
Over 10 mil |
| 125 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
QED1005 |
 |
REPLACE DISTRIBUTION WATER MAIN IN LONG ISLAND CITY AND ASTORIA |
 |
Over 10 mil |
| 126 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
QED1006 |
 |
REPLACE OLD, UNLINED CAST IRON WATER MAIN AND IMPROVE WATER DISTRIBUTION AT MULTIPLE LOCATIONS, QUEENS, IN AN AREA BOUNDED BY HILLSIDE AVENUE TO THE NORTH, JAMAICA AVENUE TO THE SOUTH, AND BETWEEN 195TH AND 199TH STREETS |
 |
1000-2500 |
| 127 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
QED1008 |
 |
INSTALL TRUNK WATER MAIN ALONG 54TH STREET BETWEEN FLUSHING AND GRAND AVENUES |
 |
Over 10 mil |
| 128 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
RWM013 |
 |
REHABILITATE CONCRETE RETAINING WALL ALONG EDGECOMBE AVENUE FROM WEST 165TH STREET TO WEST 168TH STREET, AND REPAIR FOUR RETAINING WALLS ON UNION TURNPIKE IN THE VICINITY OF QUEENS BOULEVARD ADDRESSING SAFETY CONCERNS |
 |
1000-2500 |
| 129 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
RWM015 |
 |
REHABILITATE/RECONSTRUCT THE STONE RETAINING WALL ALONG THE WEST SIDE OF RIVERSIDE DRIVE BETWEEN WEST 177TH AND WEST 178TH STREETS |
 |
1000-2500 |
| 130 |
 |
2013 |
 |
Oct 01 - Dec 31 |
 |
Construction |
 |
RWM016 |
 |
REHABILITATE STONE RETAINING WALL ALONG THE WEST SIDE OF RIVERSIDE DRIVE, NORTHBOUND, FROM WEST 177TH STREET TO WEST 178TH STREET |
 |
5000-10000 |
| 131 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
RWM017 |
 |
REHABILITATE CONCRETE RETAINING WALL ALONG WEST 155TH STREET FROM RIVERSIDE DRIVE TO BROADWAY |
 |
2500-5000 |
| 132 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
RWX018 |
 |
RETROFIT THE MULTI-LEVEL MASONRY RETAINING WALLS AND STAIRWAY ON EAST 168TH STREET BETWEEN TELLER AND CLAY AVENUES |
 |
2500-5000 |
| 133 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
RWX019 |
 |
REHABILITATE RETAINING WALL AT MACOMB DAM BRIDGE APPROACH TO 161ST STREET -- INCLUDES STREET RECONSTRUCTION |
 |
2500-5000 |
| 134 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
RWX020 |
 |
REHABILITATE/REPLACE THE CONCRETE RETAINING WALL ALONG NORTHBOUND JEROME AVENUE BEYOND EAST 196TH STREET, INCLUDING REPLACEMENT OF EXISTING CURB AND SIDEWALK |
 |
5000-10000 |
| 135 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
RWX021 |
 |
REHABILITATE/REPLACE RETAINING WALL ALONG THE WEST SIDE OF CANNON PLACE NEAR WEST 238TH STREET IN THE BRONX |
 |
2500-5000 |
| 136 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
S136-385C |
 |
REPLACE WINDOWS |
 |
1000-2500 |
| 137 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SE-751 |
 |
INSTALL SANITARY SEWERS, STORM SEWERS, WATER MAINS AND APPURTENANCES IN CHESTER AVENUE AND VICINITY INCLUDING PORTIONS OF HYLAN BOULEVARD, HUGUENOT, EDITH, SWAIN, JARVIS, ARBUTUS AND YEOMALT AVENUES, AND IRVINGTON AND COLON STREETS |
 |
Over 10 mil |
| 138 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SE798 |
 |
INSTALL STORM AND SANITARY SEWERS; REPLACE WATER MAINS, IN ROBINSON AVENUE AND VICINITY |
 |
Over 10 mil |
| 139 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SE803 |
 |
INSTALL SANITARY AND STORM SEWERS: AMBOY ROAD FROM ACACIA AVENUE TO HILLSIDE TERRACE; NELSON, BROWN AND CLEVELAND AVENUES FROM AMBOY TO RUSTIC PLACE; HILLSIDE TERRACE FROM AMBOY TO RUSTIC PLACE; RAMBLE ROAD FROM ADRIENNE PLACE TO DENT ROAD; AND PORTIONS OF OTHER NEARBY STREETS INCLUDING LOCUST AND RUSTIC PLACES, GRANDVIEW AND MONTICELLO TERRACES, AND ACACIA AVENUE |
 |
Over 10 mil |
| 140 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SE807 |
 |
INSTALL STORM AND SANITARY SEWERS, AND DIVERT CATCH BASIN FLOW FROM EXISTING SANITARY SEWERS TO NEW STORM SEWERS --NUMEROUS LOCATIONS |
 |
Over 10 mil |
| 141 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SE810 |
 |
INSTALL SANITARY AND STORM SEWERS, AND WATER MAIN: STREETS WITHIN THE WHITESTONE QUEENS AREA APPROXIMATELY DEFINED BY 20TH AVENUE TO THE NORTH, 29TH AVENUE TO THE SOUTH, AND 149TH STREET AND PARSONS BOULEVARD TO THE EAST AND WEST |
 |
Over 10 mil |
| 142 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SE814 |
 |
REPLACE COMBINED SEWER AND PERFORM RELATED WATER MAIN WORK: CALAMUS AVENUE BETWEEN 74TH AND 69TH STREETS, AND VICINITY |
 |
Over 10 mil |
| 143 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SE818 |
 |
CONSTRUCT SANITARY AND STORM SEWERS, WATER MAINS AND APPURTENANCES IN AREA SURROUNDED BY RENSSELAER, HUGUENOT, ROSEDALE AND BELFIELD AVENUES, AND POWELL STREET. PROJECT INCLUDES A BEST MANAGEMENT PRACTICE STORM SEWER OUTLET |
 |
Over 10 mil |
| 144 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
SEC20004Q |
 |
RECONSTRUCT COLLAPSED OR OTHERWISE DEFECTIVE SANITARY, COMBINED, STORM SEWERS, FORCE MAINS, ETC., CITYWIDE |
 |
Over 10 mil |
| 145 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SECBHLN1 |
 |
REBUILD CATCH BASINS -- MANHATTAN COMMUNITY BOARD 6 |
 |
500-1000 |
| 146 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SECBMTAN2 |
 |
RECONSTRUCT CATCH BASINS IN PROXIMITY TO MTA/LIRR FACILITIES IN MANHATTAN |
 |
250-500 |
| 147 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
SECBMTAQ1 |
 |
INSTALL CATCH BASINS, 47 LOCATIONS IN QUEENS |
 |
500-1000 |
| 148 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SEK002370 |
 |
REHABILITATE THE COMBINED SEWER IN PROVOST STREET BETWEEN GREENPOINT AVENUE AND HURON STREET, AND IN JEWEL STREET BETWEEN GREENPOINT AVENUE AND NORMAN STREET |
 |
1000-2500 |
| 149 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SEK002373 |
 |
INSTALL STORM SEWER EXTENSION AT ABBEY COURT BETWEEN LOIS AVENUE AND PLUMB BEACH CHANNEL, AND INSTALL CATCH BASINS AT VARIOUS LOCATIONS IN BROOKLYN |
 |
500-1000 |
| 150 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SEK20065 |
 |
INSTALL HIGH LEVEL STANDARD STORM SEWERS IN GOWANUS CANAL VICINITY TO INCLUDE SIX SEWER CHAMBERS AND AN OUTFALL |
 |
5000-10000 |
| 151 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SEK201BN3 |
 |
RECONSTRUCT CEMENT PIPE SEWERS, BOROUGH-WIDE |
 |
5000-10000 |
| 152 |
 |
2013 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
SEK201BS3 |
 |
RECONSTRUCT EXISTING COLLAPSED VITREOUS CLAY SEWERS, BOROUGH-WIDE |
 |
5000-10000 |
| 153 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SEQ200464 |
 |
INSTALL STORM AND SANITARY SEWERS, AND WATER MAIN, SECTIONS OF 9TH, 10TH, AND POPPENHUSEN AVENUES, AND 115TH, 116TH AND 117TH STREETS, COLLEGE POINT |
 |
2500-5000 |
| 154 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
SEQ200483 |
 |
INSTALL STORM AND COMBINED SEWER EXTENSIONS AND REPLACE WATER MAIN: HOOK CREEK BOULEVARD, MERRICK ROAD AND BROOKVILLE BOULEVARD INCLUDING ADJACENT SECTIONS OF 241ST, 242ND, 243RD AND 244TH STREETS; 130TH, 132ND AND 133RD AVENUES; AND 128TH, 131ST AND 132ND ROADS |
 |
5000-10000 |
| 155 |
 |
2013 |
 |
Oct 01 - Dec 31 |
 |
Construction |
 |
SER00201W |
 |
EMERGENCY REPAIR AND RECONSTRUCTION OF EXISTING DETERIORATED VITREOUS CLAY PIPE SEWERS IN VARIOUS LOCATIONS, BOROUGH OF STATEN ISLAND |
 |
2500-5000 |
| 156 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SER002162 |
 |
CONSTRUCT SANITARY AND STORM SEWERS IN WILLOW AVENUE BETWEEN TOMPKINS AVENUE AND BAY STREET |
 |
1000-2500 |
| 157 |
 |
2013 |
 |
Oct 01 - Dec 31 |
 |
Construction |
 |
SER002311 |
 |
CONSTRUCT STORM AND SANITARY SEWERS AND APPURTENANCES: BERTRAM, PHILIP AND POILLON AVENUES BELOW HYLAN BOULEVARD, INCLUDING KENWOOD AVENUE, LYNCH STREET, PLUS HYLAN BETWEEN BERTRAM AND PHILIP |
 |
5000-10000 |
| 158 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SER002318 |
 |
REPLACE SANITARY SEWER IN WINDSOR ROAD BETWEEN LITTLE CLOVE ROAD AND TODT HILL ROAD |
 |
500-1000 |
| 159 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SER200100 |
 |
INSTALL A STORM SEWER EXTENSION IN AMSTERDAM AVENUE BETWEEN CARNEGIE AVENUE AND ARLENE STREET |
 |
1000-2500 |
| 160 |
 |
2013 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
SER200208 |
 |
INSTALL STORM AND SANITARY SEWERS, WATER MAINS AND APPURTENANCES IN WARDS POINT AVENUE AND ADJACENT SECTIONS OF AMBOY ROAD, SATTERLEE STREET, TOTTENVILLE PLACE AND PERTH AMBOY PLACE |
 |
1000-2500 |
| 161 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SER200209 |
 |
INSTALL STORM AND SANITARY SEWERS, AND WATER MAIN: WOODROW ROAD FROM BELFIELD AVENUE TO JEFFERSON AVENUE; BELFIELD FROM WOODROW TO CROWN AVENUE; HOLCOMB AVENUE FROM WOODROW TO CROWN; CANTON AVENUE FROM VESPA AVENUE TO CROWN; AND VESPA FROM CANTON TO HOLCOMB; PLUS CROWN FROM CARLTON BOULEVARD TO ROW PLACE; AND ROW PLACE FROM CROWN TO WOODROW |
 |
2500-5000 |
| 162 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SER200226 |
 |
INSTALL SANITARY AND STORM SEWERS, AND WATER MAIN REPLACEMENT, ALONG VICTORY BOULEVARD AND ADJOINING STREETS IN THE TRAVIS AREA |
 |
Over 10 mil |
| 163 |
 |
2013 |
 |
Oct 01 - Dec 31 |
 |
Construction |
 |
SETVDDC12 |
 |
REMOTE CAMERA SEWER INSPECTIONS ON AN AS-NEEDED BASIS, CITYWIDE |
 |
1000-2500 |
| 164 |
 |
2013 |
 |
Apr 01 - Jun 30 |
 |
Construction |
 |
SEX200400 |
 |
INSTALL STORM AND SANITARY SEWERS IN MINNIEFORD AVENUE AND VICINITY |
 |
1000-2500 |
| 165 |
 |
2013 |
 |
Jan 01 - Mar 31 |
 |
Construction |
 |
SEX20042 |
 |
INSTALL STORM SEWER IN WILLIAM AVENUE BETWEEN DITMARS STREET AND TIER STREET |
 |
250-500 |
| 166 |
 |
2014 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
PV655QCFM |
 |
RESTORE GREENHOUSES THAT ARE WITHIN THE SEVEN-ACRE NEW YORK CITY LANDMARK AREA OF THE QUEENS COUNTY FARM MUSEUM |
 |
1000-2500 |
| 167 |
 |
2014 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
RWM022 |
 |
REHABILITATE THE CONCRETE RETAINING WALL ALONG THE NORTHBOUND SIDE OF PARK AVENUE FROM EAST 33RD TO EAST 34TH STREET |
 |
500-1000 |
| 168 |
 |
2014 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
RWM022S |
 |
REHABILITATE THE CONCRETE RETAINING WALL ADJACENT TO PARK AVENUE, SOUTHBOUND, BETWEEN EAST 33RD AND 34TH STREETS |
 |
500-1000 |
| 169 |
 |
2014 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
S136-383Q |
 |
HVAC REPLACEMENT/UPGRADE AND ASSOCIATED ELECTRICAL WORK |
 |
1000-2500 |
| 170 |
 |
2014 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
SEQ200490 |
 |
STORM SEWER EXTENSIONS AND RELATED WATER MAIN WORK IN 95TH STREET AND VICINITY |
 |
1000-2500 |
| 171 |
 |
2014 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
SEQ200524 |
 |
STORM SEWER EXTENSIONS, SANITARY SEWERS AND WATER MAIN REPLACEMENT IN FAR ROCKAWAY: SECTIONS OF BEACH 20TH, 21ST, 22ND, 23RD AND 25TH STREETS; NEW HAVEN, COLLIER AND BROOKHAVEN AVENUES; ELK DRIVE AND BRIAR PLACE |
 |
5000-10000 |
| 172 |
 |
2014 |
 |
Jul 01 - Sep 30 |
 |
Construction |
 |
SEQ200529 |
 |
INSTALL STORM AND COMBINED SEWERS, AND PERFORM RELATED WATER MAIN WORK, BROOKVILLE BOULEVARD VICINITY |
 |
5000-10000 |
| 173 |
 |
2014 |
 |
Jul 01 - Sep 30 |
 |
Plumbing, HVAC, Elec, GC |
 |
TF18-2012 |
 |
MAJOR RESTORATION OF PARKING GARAGE TO INCLUDE STRUCTURAL REHABILITATION, UPDATED LIGHTING AND ELEVATOR, NEW EXTERIOR CLADDING, PARKING DECK RESURFACING AND OFFICE SPACE RENOVATION |
 |
5000-10000 |
| 174 |
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
|
|