The City of New York is committed to achieving excellence in the design and
construction of its capital program, and building on the tradition of
innovation in architecture and engineering that has contributed to the City's
prestige as a global destination. As part of this effort, DDC is pleased to
announce the following contracting opportunites:
| # |
 |
PIN |
 |
RFP |
 |
SELECTED FIRMS |
| 1 |
 |
8502013HW0063P |
 |
HD-161D, Resident Engineering Inspection Services for the Reconstruction of Gateway Estate Area-Phase D, Borough of Brooklyn The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 4/25/2013 Addendum 1, Posted 5/13/2013 |
 |
In Process |
| 2 |
 |
8502013WM0013P 8502013WM0014P |
 |
RESIDENT ENGINEERING INSPECTION SERVICES FOR WATER MAIN WORK IN VARIOUS LOCATIONS, BOROUGH OF QUEENS The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 4/22/2013 |
 |
In Process |
| 3 |
 |
8502013HW0058P |
 |
Pre-Scoping Services for the Porpoise Bridge in Flushing Meadows-Corona Park, Borough of Queens MWBE Goals, Posted 4/10/2013 Addendum 1, Posted 5/2/2013 |
 |
In Process |
| 4 |
 |
8502013HW0052P 8502013HW0053P 8502013HW0054P 8502013HW0055P 8502013HW0056P 8502013HW0057P |
 |
RESIDENT ENGINEERING INSPECTION SERVICES FOR PRIOR NOTICE SIDEWALKS, BOROUGHS OF QUEENS, BROOKLYN, BRONX, MANHATTAN, CITYWIDE AND STATEN ISLAND MWBE Goals, Posted 4/1/2013 Addendum 1, Posted 4/2/2013 Addendum 2, Posted 4/4/2013 Addendum 3, Posted 4/15/2013 |
 |
In Process |
| 5 |
 |
8502013HW0045P 8502013HW0046P 8502013HW0047P |
 |
REQUIREMENTS CONTRACTS FOR LANDSCAPE ARCHITECTURAL SERVICES FOR INFRASTRUCTURE PROJECTS, BOROUGHS OF MANHATTAN, BRONX, BROOKLYN, STATEN ISLAND AND QUEENS MWBE Goals, Posted 3/11/2013 Addendum 1, Posted 3/27/2013 Pre-Proposal Conference Minutes, Posted 4/1/2013 Addendum 2, Posted 4/2/2013 |
 |
In Process |
| 6 |
 |
8502013SE0018P |
 |
REI SERVICES FOR THE REPLACEMENT OF COMBINED SEWER IN CALAMUS AVENUE The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 2/26/2013 Addendum 1, Posted 3/12/2013 |
 |
In Process |
| 7 |
 |
8502013VP0008P 8502013VP0009P 8502013VP0010P |
 |
REQUIREMENTS CONTRACTS FOR ENGINEERING DESIGN AND RELATED SERVICES FOR LARGE INFRASTRUCTURE PROJECTS MWBE Goals, Posted 12/18/2012 Addendum 1, Posted 1/4/2013 Addendum 2, Posted 1/11/2013 Pre-Proposal Conference Minutes, Posted 1/11/2013 |
 |
In Process |
| 8 |
 |
8502013SE0003P 8502013SE0004P |
 |
Requirement Contract for Engineering Design and Related Services in Connection with Green Infrastructure Work, Boroughs of Queens and the Bronx MWBE Goals, Posted 12/13/2012 Addendum 1, Posted 12/20/2012 Addendum 2, Posted 12/31/2012 Addendum 3, Posted 1/7/2013 Addendum 4, Posted 1/11/2013 |
 |
In Process |
| 9 |
 |
8502013VP0011P 8502013VP0012P 8502013VP0013P |
 |
DESIGN REQUIREMENT CONTRACT - MANHATTAN AND BRONX (Small Contracts) [CONTRACT #1 OF 3] MWBE Goals, Posted 11/15/2012 Pre-Proposal Conference Minutes, Posted 12/11/2012 |
 |
In Process |
| 10 |
 |
8502013HW0014P |
 |
REI SERVICES RECONSTRUCTION OF GRAND CONCOURSE SERVICE ROADS MWBE Goals, Posted 10/22/2012 Addendum 1, Posted 10/23/2012 Addendum 2, Posted 11/15/2012 |
 |
In Process |
| 11 |
 |
8502013HW0019P |
 |
Pre-Scoping Services for the Reconstruction of Hunters Point Area, Long Island City, Queens MWBE Goals, Posted 10/2/2012 Addendum 1, Posted 10/31/2012 Addendum 2, Posted 11/2/2012 |
 |
In Process |
| 12 |
 |
8502012VP0005P |
 |
RQ_A & E, Requirements Contract for Special Inspection and Laboratory Services for Various Projects, Citywide MWBE Goals, Posted 8/13/2012 Addendum 1, Posted 8/24/2012 Pre-Proposal Conference Meeting Minutes, Posted 8/29/2012 |
 |
In Process |
| 13 |
 |
8502013WM0001P |
 |
MED600B, Resident Engineering Inspection Services for Trunk Water Mains in 58th Street to Connect Shaft 33B to the Distribution System, Borough of Manhattan MWBE Goals, Posted 8/8/2012 Addendum 1, Posted 8/13/2012 |
 |
In Process |
| 14 |
 |
8502012HW0052P |
 |
HBPED700Q, Pre-Scoping Design Services for the Passerelle Pedestrian Bridge, Borough of Queens MWBE Goals, Posted 7/18/2012 |
 |
Final List |
| 15 |
 |
8502012VP0008P 8502012VP0009P 8502012VP0010P 8502012VP0011P 8502012VP0012P 8502012VP0013P 8502012VP0014P 8502012VP0015P 8502012VP0016P 8502012VP0017P 8502012VP0018P 8502012VP0019P 8502012VP0020P 8502012VP0021P 8502012VP0022P 8502012VP0023P 8502012VP0024P 8502012VP0025P 8502012VP0026P 8502012VP0027P |
 |
RFP-20, Twenty Architectural and Engineering Design Requirements Contracts for Small Projects, Citywide MWBE Goals, Posted 7/9/2012 Addendum 1, Posted 7/20/2012 Pre-Proposal Conference Minutes, Posted 7/31/2012 Addendum 2, Posted 8/7/2012 |
 |
Final List |
| 16 |
 |
8502012TR0006P |
 |
S216-415A, Construction Management Services for the Renovation and Rehabilitation of the West 59th Street Marine Transfer Station, Borough of Manhattan MWBE Goals, Posted 7/12/2012 Addendum 1, Posted 7/23/2012 Addendum 2, Posted 7/24/2012 Addendum 3, Posted 7/27/2012 Addendum 4, Posted 7/27/2012 Pre-Proposal Conference Minutes, Posted 8/1/2012 |
 |
Final List |
| 17 |
 |
8502012HW0055P |
 |
HW349FED, Resident Engineering Inspection Services for Resurfacing, Pavement Improvements and General Repairs at Various Locations within Brooklyn, the Bronx and Queens |
 |
Final List |
| 18 |
 |
8502012VP0028P 8502012VP0029P 8502012VP0030P 8502012VP0031P 8502012VP0032P 8502012VP0033P |
 |
RFP-6, Six Architectural and Engineering Design Requirements Contracts for Large Projects, Citywide MWBE Goals, Posted 7/9/2012 Addendum 1, Posted 7/20/2012 Pre-Proposal Conference Minutes, Posted 7/31/2012 |
 |
Final List |
| 19 |
 |
8502012HW0049P |
 |
Resident Engineering Inspection Services for the Reconstruction of Times Square Area MWBE Goals, Posted 6/13/2012 Addendum 1, Posted 6/18/2012 |
 |
Final List |
| 20 |
 |
8502012HW0046P |
 |
HD-161C, Resident Engineering Inspection Services for the Reconstruction of the Gateway Estates Area - Phase C, Borough of Brooklyn The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 5/8/2012 Addendum 1, Posted 5/15/2012 Addendum 2, Posted 5/22/2012 |
 |
Final List |
| 21 |
 |
8502012RQ0004P |
 |
Requirements Contract for Topographical Surveying Services for Various Infrastructure Projects, Borough of Manhattan MWBE Goals, Posted 5/4/2012 Addendum 1, Posted 5/9/2012 Pre-Prosposal Conference Minutes, Posted 5/24/2012 |
 |
In Process |
| 22 |
 |
8502012RQ0003P |
 |
Requirements Contract for Topographical Surveying Services for Various Infrastructure Projects, Borough of Brooklyn MWBE Goals, Posted 5/4/2012 Addendum 1, Posted 5/9/2012 Pre-Proposal Conference Minutes, Posted 5/24/2012 |
 |
Final List |
| 23 |
 |
8502012RQ0006P |
 |
Requirements Contract for Topographical Surveying Services for Various Infrastructure Projects, Borough of The Bronx MWBE Goals, Posted 5/4/2012 Addendum 1, Posted 5/9/2012 (Addendum No. 1) Addendum 2, Posted 5/17/2012 Pre-Prosposal Conference Minutes, Posted 5/24/2012 |
 |
In Process |
| 24 |
 |
8502012RQ0001P |
 |
Requirements Contract for Topograghical Surveying Services for Various Infrastructures Projects, Borough of Staten Island MWBE Goals, Posted 4/30/2012 Addendum 1, Posted 5/9/2012 Pre-Proposal Conference Minutes, Posted 5/24/2012 |
 |
Final List |
| 25 |
 |
8502012RQ0002P |
 |
Requirements Contract for Topographical Surveying Services for Various Infrastructures Projects, Borough of Queens MWBE Goals, Posted 4/30/2012 Addendum 1, Posted 5/9/2012 Pre-Prosposal Conference Minutes, Posted 5/24/2012 |
 |
In Process |
| 26 |
 |
8502012HW0040P |
 |
Resident Engineering Inspection Services for the Reconstruction of Broadway, Phase 1, Borough of Manhattan The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. Addendum 1, Posted 5/9/2012 |
 |
In Process |
| 27 |
 |
8502012WM0011P |
 |
Resident Engineering Inspection Services for Water Main Replacement at Various Locations , Borough of Queens The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 3/26/2012 Addendum 1, Posted 4/18/2012 (Addendum No. 1 _8502012WM0011P) |
 |
Final List |
| 28 |
 |
8502012HW0033P |
 |
FINAL DESIGN SERVICES FOR THE RECONSTRUCTION OF BERGEN AVENUE AREA, BKLYN MWBE Goals, Posted 3/6/2012 |
 |
Final List |
| 29 |
 |
8502012HW0024P |
 |
Preliminary and Final Design Services for Brookville Blvd. and Edgewood Triangle MWBE Goals, Posted 2/13/2012 Addendum 1, Posted 3/2/2012 |
 |
Final List |
| 30 |
 |
8502012VP0001P |
 |
JOCS-DDC, Requirements Contract for Job Order Contracting System in Connection with Various Capital Projects, Citywide Addendum 1, Posted 2/16/2012 Pre-Proposal Conference Meeting Minutes, Posted 2/24/2012 Addendum 2, Posted 2/29/2012 Appendix 2 - Job Order Contract Technical Specifications (Part 1), Posted 2/29/2012 Appendix 2 - Job Order Contract Technical Specifications (Part 2), Posted 2/29/2012 Appendix 3 - Job Order Contract Construction Task Catalog, Posted 2/29/2012 Addendum 3, Posted 3/8/2012 |
 |
Final List |
| 31 |
 |
8502011VP0042P 8502011VP0043P 8502011VP0044P |
 |
Requirements Contract for CM Services, Citywide for Transportation Unit [CONTRACT #1 OF 3] MWBE Goals, Posted 11/4/2011 Pre-Proposal Conference Meeting for November 28, 2011, Posted 12/5/2011 Addendum 1, Posted 12/5/2011 |
 |
Final List |
| 32 |
 |
8502012SE0005P |
 |
SE-807, Preliminary and Final Design Services for the Installation of Storm and Sanitary Sewers on 20th Ave., between 126th St. and U.S. Bulkhead Line Area and Water Main Replacement in College Point Blvd., between 11th and 22nd Avenues, Borough of Queens MWBE Goals, Posted 11/2/2011 Addendum 1, Posted 11/3/2011 Addendum 2, Posted 11/9/2011 Addendum 3, Posted 11/23/2011 |
 |
Final List |
| 33 |
 |
8502012WM0001P |
 |
MED-598, Resident Engineering Inspection Services for the Installation of Trunk Water Mains on 10th Avenue, Borough of Manhattan The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 8/24/2011 |
 |
Final List |
| 34 |
 |
8502011HW0059P |
 |
PRELIMINARY AND FINAL DESIGN SERVICES FOR THE RECONSTRUCTION OF LAKEVIEW BLVD. EAST, SOUTH JAMAICA AREA, BOROUGH OF QUEENS MWBE Goals, Posted 8/15/2011 Addendum 1, Posted 8/24/2011 |
 |
Final List |
| 35 |
 |
8502011HW0053P |
 |
HWRC054-R. REI SERVICES FOR HYLAN BOULEVARD INTERSECTION IMPROVEMENT, BOROUGH OF STATEN ISLAND The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 8/1/2011 Addendum 1, Posted 8/17/2011 Addendum 2, Posted 8/26/2011 |
 |
Final List |
| 36 |
 |
8502011HW0056P |
 |
P-5FRESHU, Preliminary Design Services for Improvements to the West Shore Expressway Service Roads and Fresh Kills Park Road, in the Borough of Staten Island MWBE Goals, Posted 7/27/2011 Addendum 1, Posted 8/10/2011 Addendum 2, Posted 8/16/2011 Pre-Proposal Conference Meeting Minutes for August 11, 2011, Posted 8/18/2011 Bridge Inspection Report, Posted 8/18/2011 |
 |
Final List |
| 37 |
 |
8502011VP0041P |
 |
RESIDENT ENGINEERING INSPECTION SERVICES FOR THE REHABILITATION OF HIGH BRIDGE, BOROUGHS OF MANHATTAN AND THE BRONX The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. Addendum 1, Posted 7/29/2011 Addendum 2, Posted 8/2/2011 Addendum 3, Posted 8/10/2011 |
 |
Final List |
| 38 |
 |
8502011RQ0008P 8502011RQ0009P 8502011RQ0010P 8502011RQ0011P 8502011RQ0012P |
 |
PW311STLS, Five Requirements Contracts for Topographical Surveying Services for Various Structures Projects, Boroughs of Staten Island, Queens, Brooklyn, Manhattan, and The Bronx MWBE Goals, Posted 7/14/2011 Addendum 1, Posted 7/22/2011 Addendum 2, Posted 7/28/2011 Pre-Proposal Conference Minutes, Posted 8/3/2011 |
 |
Final List |
| 39 |
 |
8502011SE0046P |
 |
SE-796, Resident Engineering Inspection Services for the Installation of New Storm and Sanitary Sewers in Richmond Valley Road, Staten Island The design plan for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 7/13/2011 Addendum 1, Posted 7/19/2011 Addendum 2, Posted 7/25/2011 |
 |
Final List |
| 40 |
 |
8502011VP0045P |
 |
ENGINSP4, REQUIREMENTS CONTRACT FOR PROFESSIONAL SERVICES FOR INSPECTION AND MATERIAL TESTING OF WATER MAIN AND SEWER PIPES AND APPURTENANCES AT VARIOUS LOCATIONS THROUGHOUT THE UNITED STATES AND FOREIGN COUNTRIES Pre-Proposal Conference Minutes, Posted 8/1/2011 |
 |
Final List |
| 41 |
 |
8502011SE0045P |
 |
Resident Engineering Inspection Services for the Installation of Storm and Sanitary Sewers and Water Mains in the McBaine Avenue Area, Borough of Staten Island The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 7/5/2011 Addendum 1, Posted 7/19/2011 Addendum 2, Posted 7/25/2011 |
 |
Final List |
| 42 |
 |
8502011SE0035P |
 |
SE-817, Resident Engineering Inspection Services for the Installation of Storm and Sanitary Sewers in Beach 29th Street, in the Borough of Queens MWBE Goals, Posted 6/20/2011 Addendum 1, Posted 6/21/2011 Addendum 2, Posted 6/27/2011 Addendum 3, Posted 7/6/2011 |
 |
Final List |
| 43 |
 |
8502011PW0018P 8502011PW0019P |
 |
Requirements Contract for Geotechnical Engineering Services for Various Projects, Citywide Pre-Proposal Conference Minutes, Posted 7/12/2011 |
 |
Final List |
| 44 |
 |
8502011HW0046P |
 |
PRELIMINARY AND FINAL DESIGN SERVICES FOR THE RECONSTRUCTION OF THE TILLARY STREET AREA, IN THE BOROUGH OF BROOKLYN |
 |
Final List |
| 45 |
 |
8502011HW0051P |
 |
PRELIMINARY AND FINAL DESIGN SERVICES FOR THE RECONSTRUCTION OF BLOOMINGDALE ROAD FROM ARTHUR KILL ROAD TO AMBOY ROAD, BOROUGH OF STATEN ISLAND MWBE Goals, Posted 4/26/2011 Addendum 1, Posted 5/12/2011 |
 |
Final List |
| 46 |
 |
8502011SE0034P |
 |
RESIDENT ENGINEERING INSPECTION SERVICES FOR SANITARY AND STORM SEWERS INSTALLATION IN CHANDLER STREET, BOROUGH OF QUEENS The design plans for this project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 4/21/2011 |
 |
Final List |
| 47 |
 |
8502011VP0039P 8502011VP0040P |
 |
CONSTRUCTION MANAGEMENT/DESIGN/BUILD FOR REMOVAL/UPGRADE/REPLACEMENT OF CITY-OWNED HEATING OIL TANKS AT VARIOUS SITES, CITYWIDE Addendum 1, Posted 5/4/2011 Pre-Proposal Conference Minutes, Posted 5/10/2011 |
 |
Final List |
| 48 |
 |
8502011WM0005P |
 |
REI SERVICES FOR THE INSTALLATION OF WATER MAINS IN VERMONT PLACE BETWEEN CYPRESS AVENUE AND JACKIE ROBINSON PARKWAY, BOROUGH OF QUEENS AND IN THE CORLEAR AVENUE AND 238TH STREET AREA, BOROUGH OF THE BRONX The design plans for this project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 4/5/2011 |
 |
Final List |
| 49 |
 |
8502011VP0010P 8502011VP0011P 8502011VP0012P 8502011VP0013P 8502011VP0014P |
 |
Requirements Contract for Five Engineering And Construction Related Design Services For Renovation Projects Involving HVAC, Fire Protection,Electrical And Plumbing MWBE Goals, Posted 3/8/2011 Addendum 1, Posted 3/24/2011 Addendum 2, Posted 4/1/2011 |
 |
Final List |
| 50 |
 |
8502011HW0038P |
 |
HWK1129, Resident Engineering Inspection Services for the Reconstruction of Nostrand Avenue, from Flushing Ave to Atlantic Ave, Borough of Brooklyn The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 3/2/2011 |
 |
Final List |
| 51 |
 |
8502011VP0032P 8502011VP0033P 8502011VP0034P 8502011VP0035P 8502011VP0036P 8502011VP0037P 8502011VP0038P |
 |
HWCRQ2L, Seven Requirements Contracts for Resident Engineering Inspection Services for Large Infrastructure Projects, Citywide MWBE Goals, Posted 2/28/2011 Addendum 1, Posted 3/4/2011 |
 |
Final List |
| 52 |
 |
8502011SE0022P |
 |
SE-809, Resident Engineering Inspection Services for the Installation of Storm & Sanitary Sewers along the Whitestone Expressway Service Road, Borough of Queens The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 2/22/2011 Addendum 1, Posted 3/2/2011 |
 |
In Process |
| 53 |
 |
8502011CR0002P |
 |
C114NEWRI, A&E Design Services for the New Rikers Island 1,500 Bed Admissions Facility MWBE Goals, Posted 2/16/2011 Addendum 1, Posted 2/17/2011 Addendum 2, Posted 2/18/2011 Addendum 3, Posted 3/10/2011 Pre-Proposal Conference Minutes, Posted 3/10/11, Posted 3/10/2011 |
 |
Final List |
| 54 |
 |
8502011VP0015P 8502011VP0016P 8502011VP0017P 8502011VP0018P 8502011VP0019P 8502011VP0020P 8502011VP0021P |
 |
HWCRQ02S, Seven Requirements Contracts for Resident Engineering Inspection Services for Small Infrastructure Projects, Citywide MWBE Goals, Posted 2/11/2011 Addendum 1, Posted 2/22/2011 Addendum 2, Posted 3/4/2011 |
 |
Final List |
| 55 |
 |
8502011HW0029P |
 |
HWMP2020, Design Services for the Reconstruction of 9th Avenue/Ganesvoort Area, Borough of Manhattan Addendum 1, Posted 1/5/2011 Addendum 2, Posted 1/7/2011 Addendum 3, Posted 1/10/2011 Addendum 4, Posted 1/28/2011 |
 |
Final List |
| 56 |
 |
8502011WM0002P |
 |
CITYWIDE DESIGN REQUIREMENT CONTRACT - TRUNK MAIN CORROSION CONTROL Addendum 1, Posted 12/29/2010 Addendum 2, Posted 1/7/2011 Addendum 3, Posted 1/19/2011 |
 |
Final List |
| 57 |
 |
8502011WM0003P |
 |
ROCKAWAY BEACH BOULEVARD - BEACH 90 ST AND BEACH 94 ST The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 12/13/2010 Addendum 1, Posted 12/15/2010 Addendum 2, Posted 12/28/2010 |
 |
Final List |
| 58 |
 |
8502011VP0009P |
 |
Requirements Contract for Professional Services for Environmental Assessment Statements for Various Projects, Citywide MWBE Goals, Posted 12/7/2010 Addendum 1, Posted 12/15/2010 Addendum 2, Posted 12/21/2010 |
 |
Final List |
| 59 |
 |
8502011VP0005P |
 |
CM/Design/Build for Purchase and Installation of New Asphalt Plant Equipment for the Hamilton Avenue Asphalt Plant, Operated by NYC Department of Transportation, Borough of Brooklyn Addendum 1, Posted 12/10/2010 Pre-proposal Conference Minutes, Posted 12/14/2010 |
 |
Final List |
| 60 |
 |
8502011SE0008P |
 |
Resident Engineering Inspection Services for the Construction of Roadways, Curbs, Sidewalks, Watermains Storms and Sanitary Sewers in Edgemere Area (PHASE C2), Borough of Queens The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 10/27/2010 |
 |
Final List |
| 61 |
 |
8502011HW0015P 8502011HW0016P 8502011HW0017P 8502011HW0018P 8502011HW0019P |
 |
Resident Engineering Inspection Services for Prior Notice Sidewalks in the Boroughs of Brooklyn and Staten Island, Queens, Citywide, The Bronx and Manhattan MWBE Goals, Posted 10/5/2010 |
 |
Final List |
| 62 |
 |
8502010WM0020P |
 |
REI Services for Trunk Water Mains at 8th Avenue from West 12th Street to West 13th Street, Borough of Manhattan The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 8/6/2010 Addendum 1, Posted 8/11/2010 |
 |
In Process |
| 63 |
 |
8502010WM0019P |
 |
REI Services for the Construction of Trunk Water Mains at West 60th Street from West End Avenue to Columbus Avenue, Boroough of Manhattan The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 7/30/2010 Addendum 1, Posted 8/5/2010 Addendum 2, Posted 8/11/2010 Addendum 3, Posted 8/12/2010 |
 |
In Process |
| 64 |
 |
8502010WM0016P |
 |
REI Services for Trunk Water Mains in Grand Street from Broadway to Essex Street, Borough of Manhattan The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 7/26/2010 Addendum 1, Posted 8/11/2010 Addendum 2, Posted 8/12/2010 |
 |
In Process |
| 65 |
 |
8502010WM0017P |
 |
REI Services for Trunk Water Mains in West 48th Street from 10th Avenue to Broadway, Borough of Manhattan The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 7/19/2010 Addendum 1, Posted 7/23/2010 Addendum 2, Posted 7/26/2010 Addendum 3, Posted 8/5/2010 Addendum 4, Posted 8/11/2010 Addendum 5, Posted 8/12/2010 |
 |
In Process |
| 66 |
 |
8502010RQ0002P |
 |
HWDRWALLF, Requirements Contract for Engineering Design and Related Services for Retaining Walls, Citywide MWBE Goals, Posted 4/9/2010 Addendum 1, Posted 4/9/2010 Addendum 2, Posted 4/28/2010 Addendum 3, Posted 5/19/2010 Addendum 4, Posted 5/28/2010 |
 |
Final List |
| 67 |
 |
8502010WM0008P |
 |
MED599, Resident Engineering Inspection Services for Trunk Water Mains in West 48th Street from 10th Avenue to Broadway, Borough of Manhattan The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 3/4/2010 Addendum 1, Posted 3/24/2010 |
 |
In Process |
| 68 |
 |
8502010HW0046P |
 |
HWS2010Q, HWS2010K, HWS2010X, HWS2010M, Resident Engineering Inspection Services for Prior Notice Sidewalks, Boroughs of Queens, Brooklyn, Bronx and Manhattan MWBE Goals, Posted 2/9/2010 Addendum 1, Posted 2/17/2010 (Addendum No. 1) |
 |
Final List |
| 69 |
 |
8502010HW0037P |
 |
HW2CR11A, Resident Engineering Inspection Services for Street Milling, Citywide MWBE Goals, Posted 2/3/2010 Addendum 1, Posted 2/17/2010 (Addendum No. 1) |
 |
Final List |
| 70 |
 |
8502010HW0042P |
 |
HWP2010MX, HWP2010R , HWP2010CW, Resident Engineering Inspection Services for the Construction of Pedestrian Ramps, Boroughs of the Bronx & Manhattan, Staten Island and Citywide. MWBE Goals, Posted 1/26/2010 Addendum 1, Posted 2/16/2010 (Addendum No. 1) |
 |
Final List |
| 71 |
 |
8502010WM0003P |
 |
Resident Engineering Inspection Services for Trunk Water Mains in East 59th Street Between 1st and 3rd Avenue, Borough of Manhattan MWBE Goals, Posted 11/20/2009 Addendum 1, Posted 12/3/2009 Addendum 2, Posted 12/4/2009 (The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.) |
 |
Final List |
| 72 |
 |
8502010HW0014P |
 |
HWD105-01, Resident Engineering Inspection for the Reconstruction of Metropolitan Avenue and Unionport Road Medians in Parkchester Area, Borough of the Bronx The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment MWBE Goals, Posted 9/22/2009 |
 |
Final List |
| 73 |
 |
8502010HW0013P |
 |
Resident Engineering Inspection Services for the Reconstruction of Pratt Avenue Area, Borough of the Bronx The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 9/9/2009 |
 |
Final List |
| 74 |
 |
8502009VP0041P |
 |
Construction Management/ Design/ Build for the Removal/ Upgrade/ Replacement of City-Owned Petroleum Storage Tanks, Citywide Pre-proposal Conference Minutes, Posted 9/23/2009 Addendum 1, Posted 9/23/2009 |
 |
Final List |
| 75 |
 |
8502009PW0005P |
 |
Requirements Contract for Environmental Services for Various Projects, Citywide MWBE Goals, Posted 8/5/2009 Addendum 1, Posted 8/19/2009 Pre-Proposal Conference August 17, 2009 Minutes, Posted 8/25/2009 |
 |
Final List |
| 76 |
 |
8502009HW0060P |
 |
Resident Engineering Inspection Services for the Reconstruction of Eastern Parkway,Borough of Brooklyn The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 7/28/2009 |
 |
Final List |
| 77 |
 |
8502009HW0059P |
 |
Resident Engineering Inspection Services for the Reconstruction of Nassau Avenue, Borough of Brooklyn The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 7/23/2009 Addendum 1, Posted 7/27/2009 |
 |
Final List |
| 78 |
 |
8502009HW0053P |
 |
RESIDENT ENGINEERING INSPECTION SERVICES AND MINOR DESIGN SERVICES FOR THE RECONSTRUCTION AND REPLACEMENT OF COMPLEX PEDESTRIAN RAMPS FOR THE BOROUGHS OF QUEENS, BROOKLYN, MANHATTAN AND THE BRONX MWBE Goals, Posted 6/18/2009 |
 |
In Process |
| 79 |
 |
8502009HW0051P |
 |
RESIDENT ENGINEERING INSPECTION SERVICES FOR THE RECONSTRUCTION OF EAST HOUSTON STREET The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 6/8/2009 |
 |
Final List |
| 80 |
 |
8502009VP0010P 8502009VP0011P 8502009VP0012P 8502009VP0013P 8502009VP0014P 8502009VP0015P 8502009VP0016P 8502009VP0017P 8502009VP0018P 8502009VP0019P 8502009VP0020P 8502009VP0021P 8502009VP0022P 8502009VP0023P 8502009VP0024P 8502009VP0025P 8502009VP0026P 8502009VP0027P 8502009VP0028P 8502009VP0029P |
 |
RQ_A&E, Twenty Architectural & Engineering Design Requirements Contracts for Small Projects, Citywide MWBE Goals, Posted 4/15/2009 Addendum 1, Posted 5/1/2009 Pre-Proposal Conference minutes, Posted 5/1/2009 Addendum 2, Posted 5/8/2009 |
 |
Final List |
| 81 |
 |
8502009VP0030P 8502009VP0031P 8502009VP0032P 8502009VP0033P 8502009VP0035P 8502009VP0034P 8502009VP0036P 8502009VP0037P |
 |
RQ_A&E, Eight Architectural & Engineering Design Requirements Contracts for Large Projects, Citywide MWBE Goals, Posted 4/15/2009 Addendum 1, Posted 5/1/2009 Pre-Proposal Conference minutes, Posted 5/1/2009 Addendum 2, Posted 5/8/2009 |
 |
Final List |
| 82 |
 |
8502009HW0041P 8502009HW0042P 8502009HW0043P 8502009HW0044P |
 |
RESIDENT ENGINEERING INSPECTION SERVICES FOR PRIOR NOTICE SIDEWALKS FOR THE BOROUGHS OF QUEENS, MANHATTAN, THE BRONX AND STATEN ISLAND MWBE Goals, Posted 3/26/2009 |
 |
Final List |
| 83 |
 |
8502009HW0046P |
 |
RESIDENT ENGINEERING SERVICES RECONSTRUCTION OF CHAMBERS STREET, ETC The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. |
 |
Final List |
| 84 |
 |
8502009HW0045P |
 |
RESIDENT ENGINEERING INSPECTION SERVICES FOR RECONSTRUCTION OF PAULDING AVE AREA - PHASE II The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 3/12/2009 |
 |
Final List |
| 85 |
 |
8502009PV0007P |
 |
P-213 CNTR, Construction Management Services for the Coney Island Center, Borough of Brooklyn Addendum 1, Posted 2/11/2009 Pre-Proposal Conference Minutes, Posted 2/13/2009 |
 |
Final List |
| 86 |
 |
8502009CR0002P |
 |
New Bronx Detention Complex at Hunts Point, Borough of the Bronx MWBE Goals, Posted 1/20/2009 Addendum 1, Posted 1/23/2009 Addendum 2, Posted 1/23/2009 Pre-Proposal Conference minutes, Posted 2/9/2009 |
 |
In Process |
| 87 |
 |
8502009VP0006P |
 |
Construction Management_Design_Build for Remediation and Monitoring of City-Owned Petroleum Contaminated Sites, Citywide and Upstate New York MWBE Goals, Posted 12/17/2008 Pre-Proposal Conference minutes, Posted 1/9/2009 Addendum 1, Posted 1/9/2009 |
 |
Final List |
| 88 |
 |
8502009VP0001P |
 |
8502009VP0001-2P – Design Requirements Contracts for Commissioning Services, Contract #1 and #2 minutes of September 22, 2008 Pre-Proposal Conference, Posted 9/26/2008 |
 |
Final List |
| 89 |
 |
8502008HW0072P |
 |
Resident Engineering Inspection Services for the Reconstruction of Pelham Parkway: West & East Bounds and North & South Bounds, Borough of the Bronx The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 8/13/2008 Addendum 1, Posted 8/22/2008 Addendum 2, Posted 8/28/2008 |
 |
Final List |
| 90 |
 |
8502008PW0013P |
 |
Requirements Contract for Geotechnical Inspection Services, Citywide Addendum 1, Posted 8/22/2008 Minutes of August 18, 2008 Pre-Proposal Conference, Posted 8/22/2008 |
 |
Final List |
| 91 |
 |
8502008CR0017P |
 |
Consultant for Architectural, Engineering Design and Services during Construction for James A. Thomas Center, Reconstruction Phase II, Rikers Island MWBE Goals, Posted 6/23/2008 Minutes of July 11, 2008, Posted 7/18/2008 Addendum 1, Posted 7/18/2008 |
 |
Final List |
| 92 |
 |
8502008RQ0033P |
 |
8502008RQ00033-34P – Requirements Contract for Historic Preservation Design, Architecture, Engineering and Construction Related Services, Citywide MWBE Goals, Posted 6/9/2008 Minutes of June 24, 2008 Pre-Proposal Conference, Posted 7/3/2008 Addendum 1, Posted 7/3/2008 |
 |
Final List |
| 93 |
 |
8502008RQ0006P |
 |
Requirements Contracts for Resident Engineering Inspection Services for Twelve Contracts, Citywide MWBE Goals, Posted 6/3/2008 Addendum 1, Posted 6/24/2008 |
 |
Final List |
| 94 |
 |
8502008PD0009P |
 |
Construction Management/ Build Services for the Construction of the New Police Academy, Borough of Queens Pre-Proposal Conference Minutes, Posted 6/10/2008 |
 |
Final List |
| 95 |
 |
8502008RQ0032P |
 |
Requirements Contract for Environmental Services for Various Capital Projects Citywide MWBE Goals, Posted 4/2/2008 Addendum 1, Posted 4/11/2008 Addendum 2, Posted 4/28/2008 Minutes of 4/17 Pre-Proposal Conference, Posted 4/28/2008 Addendum 3, Posted 4/30/2008 |
 |
Final List |
| 96 |
 |
8502008PW0006P |
 |
Requirements Contract for Environmental Services for Various Capital Projects, Citywide MWBE Goals, Posted 4/9/2008 Minutes of 4/17 Pre-Proposal Conference, Posted 4/28/2008 Addendum 1, Posted 5/1/2008 |
 |
Final List |
| 97 |
 |
8502008VP0009P |
 |
Requirements Contracts for Building Envelope Design, Engineering and Construction Related Services Addendum 1, Posted 4/24/2008 Minutes of 4/21/08 Pre-Proposal Conference, Posted 4/24/2008 |
 |
Final List |
| 98 |
 |
8502008HW0045P |
 |
Design of Hudson Park and Boulevard and Streetscape for Hudson Yards Area Addendum 1, Posted 4/2/2008 Addendum 2, Posted 4/7/2008 Addendum 3, Posted 4/16/2008 Minutes of 4/8 Pre-Proposal Conference, Posted 4/16/2008 |
 |
Final List |
| 99 |
 |
8502008RQ0023P |
 |
Eight Engineering Design and Related Services Requirements Contracts, Citywide MWBE Goals, Posted 3/24/2008 Addendum 1, Posted 4/15/2008 Minutes of 4/8 Pre-Proposal Conference, Posted 4/15/2008 |
 |
Final List |
| 100 |
 |
8502008HW0052P |
 |
Resident Engineering Inspection Services for Milling Projects Involving Grinding Existing Asphaltic Concrete Wearing Courses for the Boroughs of Brooklyn, Staten Island, Manhattan, the Bronx and Queens MWBE Goals, Posted 3/20/2008 |
 |
Final List |
| 101 |
 |
8502008FI0001P |
 |
Construction Management/ Build Services for the Construction of New Emergency Medical Service Station, Borough of the Bronx Addendum 1, Posted 4/4/2008 Minutes Pre-Proposal Conference, Posted 4/4/2008 |
 |
Final List |
| 102 |
 |
8502008HW0040P |
 |
Resident Engineering Inspection Services for Prior Notice Sidewalks for the Boroughs of Queens, Brooklyn, the Bronx and Manhattan MWBE Goals, Posted 3/17/2008 |
 |
Final List |
| 103 |
 |
8502008PD0002P |
 |
Construction Management/ Build Services for the Construction of the NYPD/FDNY/DoITT Public Safety Answering Center II (PSACII), Borough of the Bronx Addendum 1, Posted 3/20/2008 Addendum 2, Posted 3/27/2008 Addendum 3, Posted 4/10/2008 Minutes of 4/2/08 Pre-Proposal Conference, Posted 4/10/2008 |
 |
Final List |
| 104 |
 |
8502008CR0014P |
 |
Renovation and Expansion of the Brooklyn Detention Center, Borough of Brooklyn MWBE Goals, Posted 3/13/2008 Addendum 1, Posted 3/21/2008 Addendum 2, Posted 4/2/2008 Pre-Proposal Conference Notes, Posted 4/2/2008 Addendum 3, Posted 4/7/2008 |
 |
Final List |
| 105 |
 |
8502008PD0008P |
 |
Construction of New 121st Street Precinct, STATEN ISLAND Minutes of Pre-Proposal Conference, Posted 4/1/2008 Addendum 1, Posted 4/1/2008 |
 |
Final List |
| 106 |
 |
8502008HW0055P |
 |
HW2CR08CW, Resident Engineering Inspection Services for Milling, Citywide MWBE Goals, Posted 3/3/2008 |
 |
Final List |
| 107 |
 |
8502008VP0011P |
 |
Requirements Contract for Forensic Engineering and Construction Related Services for Building Systems, Citywide Addendum 1, Posted 3/4/2008 Minutes of Pre-Proposal Meeting-March 10, 2008, Posted 3/18/2008 |
 |
Final List |
| 108 |
 |
8502008RQ0031P |
 |
RQ_PO, Requirements Contract for Cost Management and Cost Estimating Services for Various Projects, Citywide Addendum 1, Posted 3/11/2008 Addendum 2, Posted 3/20/2008 |
 |
Final List |
| 109 |
 |
8502008HW0050P |
 |
REI SERVICES FOR THE RECONSTRUCTION OF WEST 33RD STREET BETWEEN 10TH AVE & 11TH AVE The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 1/22/2008 Addendum 1, Posted 2/14/2008 |
 |
In Process |
| 110 |
 |
8502008HW0039P |
 |
Resident Engineering Inspection Services for School Safety Improvement,Phase II Citywide The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. Addendum 1, Posted 1/14/2008 MWBE Goals, Posted 1/16/2008 |
 |
Final List |
| 111 |
 |
8502008VP0003P |
 |
HWCARRC02, Requirements Contract for Professional Services for Appraisal for Various Projects, Citywide |
 |
Final List |
| 112 |
 |
8502008VP0002P |
 |
TITLE SEARCH REQUIREMENT CONTRACT - CITYWIDE |
 |
Final List |
| 113 |
 |
8502008HW0014P |
 |
RESIDENT ENGINEERING INSPECTION SERVICES FOR THE RECONSTRUCTION OF FULTON STREET The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. |
 |
Final List |
| 114 |
 |
8502008HW0016P |
 |
RESIDENT ENGINEERING INSPECTION SERVICES FOR THE RECONSTRUCTION OF HARRISON STREET, BOROUGH OF MANHATTAN |
 |
Final List |
| 115 |
 |
8502007VP0117P 8502007VP0118P |
 |
V.C.P., Requirements Contract for Landscape Architecture, Site Engineering and Construction Related Services Addendum 1, Posted 9/17/2007 Minutes of Pre-Proposal Conference, Posted 10/3/2007 |
 |
Final List |
| 116 |
 |
8502008HW0008P |
 |
HWM1159, Resident Engineering Inspection Services for the Cobblestone Reconstruction of Peck Slip, Borough of Manhattan The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. |
 |
Final List |
| 117 |
 |
8502007PW0008P |
 |
CM/Design/Build for City-Owned Petroleum Contaminated Sites. Addendum 1, Posted 8/2/2007 |
 |
Final List |
| 118 |
 |
8502007SE0041P |
 |
Resident Engineering Inspection Services for Storm & Sanitary Sewer in 110TH Street, Borough of Queens The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 6/29/2007 |
 |
Final List |
| 119 |
 |
8502007CT0007P |
 |
CO281K-CR, Kings County Criminal Court Building Renovation, Borough of Brooklyn MWBE Goals, Posted 5/23/2007 Addendum 1, Posted 6/12/2007 (Minutes of Pre-Proposal Conference) |
 |
Final List |
| 120 |
 |
8502007PD0008P |
 |
PO205-PA , Consultant for Architectural, Engineering Design and Services during Construction for New Police Academy New Police Academy Location Map, Posted 5/24/2007 Minutes of Pre-Proposal Conference, Posted 6/12/2007 |
 |
Final List |
| 121 |
 |
8502007HW0072P |
 |
REI Services for Improvements to Hylan Boulevard Intersection, Staten Island The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment MWBE Goals, Posted 5/7/2007 Addendum 1, Posted 5/11/2007 |
 |
In Process |
| 122 |
 |
8502007WM0008P |
 |
REI SERVICES FOR TRUNK WATER MAIN REPLACEMENT IN CLOVE ROAD BETWEEN NARROWS ROAD NORTH AND SILVER LAKE GOLF COURSE, STATEN ISLAND The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 4/17/2007 |
 |
Final List |
| 123 |
 |
8502007PD0007P |
 |
NYPD/FDNY Public Safety Answering Center II (PSAC II), Borough of the Bronx PSAC II Location Map, Posted 4/17/2007 Addendum 1, Posted 5/10/2007 (Minutes of May 1 Pre-Proposal Conference included) |
 |
Final List |
| 124 |
 |
8502007SE0020P |
 |
REI Services for the Construction of Sanitary Sewers in Nashville Avenue, Staten Island The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 4/4/2007 Addendum 1, Posted 4/6/2007 (Cancellation Notice) |
 |
In Process |
| 125 |
 |
8502007SE0019P |
 |
REI SERVICES FOR SEWER AND WATER MAIN WORK IN RICHMOND TERRACE, BOROUGH OF STATEN ISLAND The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 4/2/2007 |
 |
In Process |
| 126 |
 |
8502007PW0004P |
 |
PW311GENV Requirements Contract for Professional Services for Environmental and Geotechnical Services for Various Capital Projects, Citywide MWBE Goals, Posted 3/27/2007 Addendum 1, Posted 4/19/2007 (Minutes of Pre-Proposal Conference) |
 |
Final List |
| 127 |
 |
8502007HW0068P |
 |
HWQP168 REI Services for the Reconstruction of 47TH Avenue, Queens MWBE Goals, Posted 3/21/2007 Addendum 1, Posted 3/29/2007 Addendum 2, Posted 4/5/2007 |
 |
Final List |
| 128 |
 |
8502007SE0018P |
 |
REI SERVICES FOR THE CONSTRUCTION OF SEWERS & BMP WORK IN NORTH RAILROAD STREET, ETC., BOROUGH OF STATEN ISLAND MWBE Goals, Posted 3/12/2007 Addendum 1, Posted 3/29/2007 |
 |
Final List |
| 129 |
 |
8502007HW0042P 8502007HW0043P 8502007HW0044P 8502007HW0045P |
 |
RESIDENT ENGINEERING INSPECTION SERVICES FOR PRIOR NOTICE SIDEWALKS IN THE BOROUGHS OF QUEENS, BROOKLYN, MANHATTAN AND THE BRONX Addendum 1, Posted 3/19/2007 MWBE Goals, Posted 3/19/2007 |
 |
Final List |
| 130 |
 |
8502007VP0114P |
 |
ENGINSP3, Requirements Contract for Engineering Services for Inspection & Material Testing of Water Main & Sewer Pipes and Appurtenances for Various Sites Addendum 1, Posted 3/16/2007 (Minutes of Pre-Proposal Conference) |
 |
Final List |
| 131 |
 |
8502007HW0063P |
 |
REI SERVICES FOR THE RECONSTRUCTION OF W 181ST STREET/RIVERSIDE DRIVE RETAINING WALL MWBE Goals, Posted 2/14/2007 Addendum 1, Posted 3/13/2007 (Cancellation Notice) |
 |
In Process |
| 132 |
 |
8502007WM0004P |
 |
REI Services for Madison Avenue Trunk Mains - Phase B Lining of 48" Water main & Reconstruction of Distribution Main on (The preliminary contract plans are now available for review. Please contact the designated contract manager for an appointment.) MWBE Goals, Posted 1/30/2007 |
 |
Final List |
| 133 |
 |
8502007HW0048P |
 |
HWCRWALLD, Requirements Contract for Engineering Design and Related Services for Retaining Walls, Citywide MWBE Goals, Posted 1/19/2007 Addendum 1, Posted 2/12/2007 |
 |
Final List |
| 134 |
 |
8502007RQ0008P 8502007RQ0009P 8502007RQ0010P 8502007RQ0011P 8502007RQ0012P 8502007RQ0013P 8502007RQ0014P 8502007RQ0015P |
 |
Structures, Eight Construction Management Services Requirements Contracts 1 of 8 Addendum 1, Posted 1/25/2007 Addendum 2, Posted 2/14/2007 Pre-Proposal Conference List of Attendees, Posted 2/14/2007 Addendum 3, Posted 2/27/2007 Pre-Proposal Conference Minutes, Posted 2/27/2007 |
 |
Final List |
| 135 |
 |
8502007HW0062P |
 |
City Lights Streetlight Design, Fabrication and Testing of Prototypes SR-Appendix I - Design-Range, Posted 1/25/2007 SR-Appendix II - Design-Intent, Posted 1/25/2007 Please view 2004 City Lights Competition History, Posted 2/1/2007 Addendum 1, Posted 2/15/2007 Pre-Proposal Conference Minutes, Posted 2/15/2007 |
 |
Final List |
| 136 |
 |
8502007HW0006P |
 |
Resident Engineering Services for the Reconstruction of Beekman Street Addendum 1, Posted 11/9/2006 (Contract Plans available) Addendum 2, Posted 11/29/2006 Addendum 3, Posted 11/29/2006 |
 |
Final List |
| 137 |
 |
8502007VP0106P 8502007VP0107P 8502007VP0108P 8502007VP0109P 8502007VP0110P 8502007VP0111P 8502007VP0112P 8502007VP0113P |
 |
Architectural and Engineering Design Requirements Contract for 8 Large Projects Addendum 1, Posted 11/21/2006 (Minutes of Pre-Proposal Conference of 11/13/06) |
 |
Final List |
| 138 |
 |
8502007VP0082P 8502007VP0083P 8502007VP0084P 8502007VP0085P 8502007VP0086P 8502007VP0087P 8502007VP0088P 8502007VP0089P 8502007VP0090P 8502007VP0091P 8502007VP0092P 8502007VP0093P 8502007VP0094P 8502007VP0095P 8502007VP0096P 8502007VP0097P 8502007VP0098P 8502007VP0099P 8502007VP0100P 8502007VP0101P 8502007VP0102P 8502007VP0103P 8502007VP0104P 8502007VP0105P |
 |
Architectural/Engineering Design Requirements Contract for 24 Small Projects Addendum 1, Posted 11/21/2006 (Minutes of Pre-Proposal Conference of 11/13/06) |
 |
Final List |
| 139 |
 |
8502007HW0005P |
 |
Requirements Contract for Resident Engineering Services for Citywide Milling - Boroughs of Brooklyn & Staten Island |
 |
Final List |
| 140 |
 |
8502007VP0001P |
 |
Contract for Counsultant Services for Job Order Contracting System Addendum 1, Posted 9/28/2006 (Minutes of Pre-Proposal Conference of 9/26/06) Addendum 2, Posted 10/6/2006 (Clarification of Information) |
 |
Final List |
| 141 |
 |
8502006FI0003P |
 |
CM/Build for the Construction of a New FDNY Emergency Mgmt. Service Station, Queens Addendum 1, Posted 9/21/2006 ((Minutes of Pre-Proposal Conference of 9/19/2006)) |
 |
Final List |
| 142 |
 |
8502007RQ0001P 8502007RQ0002P 8502007RQ0003P 8502007RQ0004P 8502007RQ0005P |
 |
Requirements Contract for Arboricultural Services for Various Projects Addendum 1, Posted 9/14/2006 |
 |
In Process |
| 143 |
 |
8502006FI0002P |
 |
Construction Management/Build Services for Rescue 3 Company Firehouse Addendum 1, Posted 9/1/2006 (8/28/2006 Meeting Minutes) |
 |
Final List |
| 144 |
 |
8502006VP0014P |
 |
Requirements Contract for Resident Engineering Inspection Services for the Reconstruction of Retaining Walls, Citywide Addendum 1, Posted 8/24/2006 (MWBEs Participation Goals) Addendum 2, Posted 9/7/2006 (Minutes for Pre-Proposal Conference of 8/30/2006) |
 |
Final List |
| 145 |
 |
8502006VP0012P 8502006VP0013P |
 |
RQ-A7E, Requirements Contract for Architectural, Engineering and Construction Related Services for HVAC, Fire Protection, Electrical and Plumbing Design Services, Citywide Addendum 1, Posted 7/6/2006 (Additional information (06/27/2006 meeting minutes)) |
 |
Final List |
| 146 |
 |
8502006HL0005P |
 |
HH115EAUC, Construction Management/Build Services for a New Family Intake Center (NFIC) for the Department of the Homeless Services, Borough of the Bronx Addendum 1, Posted 5/10/2006 (5/2/06 Meeting Minutes) |
 |
Final List |
| 147 |
 |
8502006HW0079P |
 |
HW2CR06CW, Resident Engineering Inspection Services for Citywide Milling Contract |
 |
Final List |
| 148 |
 |
8502006PK0001P |
 |
Architectural and Engineering Design Requirements Contract for the Renovation of Various Stadia Projects Addendum 1, Posted 3/20/2006 (3/9/06 Meeting Minutes) Addendum 2, Posted 3/24/2006 Addendum 3, Posted 4/3/2006 (Due Date April 10, 2006) |
 |
In Process |
| 149 |
 |
8502006HW0072P |
 |
Resident Engineering Inspection Services for Prior Notice Sidewalks, Citywide Addendum 1, Posted 2/24/2006 |
 |
Final List |
| 150 |
 |
8502006HW0070P |
 |
Resident Engineering Inspection Services for the Reconstruction of Havemeyer Avenue Area, Borough of the Bronx |
 |
In Process |
| 151 |
 |
8502006HW0069P |
 |
Resident Engineering Inspection Services for the Reconstruction of Paulding Avenue Area, Phase 1, Borough of the Bronx Addendum 1, Posted 2/13/2006 |
 |
Final List |
| 152 |
 |
8502006HW0059P 8502006HW0060P 8502006HW0061P |
 |
Requirements Contract for Arboricultural Services for Various Projects Addendum 1, Posted 1/24/2006 Addendum 2, Posted 2/7/2006 |
 |
In Process |
| 153 |
 |
8502006IN0065P 8502006IN0066P 8502006IN0067P |
 |
Consultant Design and Construction Support Services - 15 Pedestrian Bridges in the Bronx, Queens, Manhattan and Brooklyn |
 |
Final List |
| 154 |
 |
8502006PW0010P 8502006PW0011P 8502006PW0012P 8502006PW0013P 8502006PW0014P |
 |
SER-SURV6, SEQ-SURV7, SEN-SURV3, SEK-SURV3, SEX-SURV3, Requirements Contract for Surveying Services for the Preparation of Survey Documents for Various Projects in the Boroughs of Staten Island, Queens, Manhattan, Brooklyn and the Bronx Addendum 1, Posted 2/6/2006 (1/31/06 Meeting Minutes) |
 |
Final List |
| 155 |
 |
8502006HW0063P |
 |
HWP2006QC, Resident Engineering Inspection Services for the Construction of Complex Pedestrian Ramps, Borough of Queens |
 |
Final List |
| 156 |
 |
8502006HW0050P |
 |
HWP2006KC, Resident Engineering Inspection Services for the Construction of Complex Pedestrian Ramps at Designated Locations, Borough of Brooklyn |
 |
Final List |
| 157 |
 |
8502006HW0053P |
 |
HWQ248D, Resident Engineering Inspection Services for the Reconstruction of Jamaica Avenue Area, Borough of Queens |
 |
Final List |
| 158 |
 |
8502006SE0015P |
 |
SE-777, Resident Engineering Inspection Services for Construction of Sanitary and Storm Sewers and Best Management Practice (BMP) Structures in North Railroad Street, Borough of Staten Island |
 |
In Process |
| 159 |
 |
8502006HW0037P |
 |
HWX733BW, Resident Engineeering Inspection Services for the Reconstruction of East 148 Street, From Exterior Street to Ajgrifin Street, Borough of the Bronx |
 |
Final List |
| 160 |
 |
8502006HW0038P |
 |
HWX211T5B, Resident Engineering Inspection Services for the Reconstruction of Step Streeet at East 183rd Street, Borough of the Bronx |
 |
Final List |
| 161 |
 |
8502006HW0039P |
 |
HWX709, Resident Engineering Inspection Services for the Reconstruction of Ely Avenue Area, Borough of the Bronx Addendum 1, Posted 12/9/2005 |
 |
Final List |
| 162 |
 |
8502006HW0040P |
 |
HWP2006XC, Resident Engineering Inspection Services for the Construction of Complex Pedestrian Ramps, Borough of the Bronx Addendum 1, Posted 12/9/2005 |
 |
Final List |
| 163 |
 |
8502006HW0048P |
 |
HWP2006R, Resident Engineering Inspection Services for the Construction of Standard/Non-Complex Pedestrian Ramps at Various Locations, Borough of Staten Island |
 |
Final List |
| 164 |
 |
8502006HW0049P |
 |
HWK973, Resident Engineering Inspection Services for the Reconstruction of Fulton Street, Brough of Brooklyn |
 |
Final List |
| 165 |
 |
8502006HW0041P 8502006HW0043P 8502006HW0044P 8502006HW0045P 8502006HW0046P |
 |
Resident Engineering Inspection Services for the Construction of Sidewalks at Various Locations in Queens, Brooklyn, Manhattan, the Bronx and Staten Island |
 |
Final List |
| 166 |
 |
8502006HW0027P |
 |
HWQ1161, Resident Engineering Inspection Services for the Reconstruction of 99th and 110th Avenues, Borough of Queens |
 |
Final List |
| 167 |
 |
8502006HW0029P |
 |
HWK1166, Resident Engineering Inspection Services for the Reconstruction of 86th Street from Shore Road to Gatling Place, Borough of Brooklyn |
 |
Final List |
| 168 |
 |
8502006IN0001P |
 |
PV490SITE, Consultant Services for Site Planning and Construction-Related Services for Snug Harbor Land Use Plan and Phase 1 Contruction Project Addendum 1, Posted 11/21/2005 |
 |
Final List |
| 169 |
 |
8502006PW0001P 8502006PW0002P 8502006PW0003P 8502006PW0004P 8502006PW0005P |
 |
Requirements Contract for Surveying Services for the Preparation of Survey Documents for Various Projects in the Boroughs of the Bronx, Staten Island, Brooklyn, Manhattan and Queens Addendum 1, Posted 9/19/2005 (Additional Information - 09/14/2005 Meeting Minutes) |
 |
Final List |
| 170 |
 |
8502005HW0062P |
 |
HWQ724W, Resident Engineering Inspection Services for the Reconstruction of Brookville Blvd. Area, Borough of Queens Addendum 1, Posted 8/16/2005 |
 |
Final List |
| 171 |
 |
8502005SE0058P |
 |
SER002271, Resident Engineering Inspection Services for the Construction of Sanitary & Storm Sewers and Best Management Practice (BMP) Structures in Lemon Creek Watershed Area, Borough of Staten Island. |
 |
In Process |
| 172 |
 |
8502005WM0007P |
 |
RED-362, Resident Engineering Inspection Services and Related Services for the Distribution Water Main Extensions/Replacement (New Buildings), Boroughs of Staten Island and Brooklyn. |
 |
Final List |
| 173 |
 |
8502005RQ0004P 8502005RQ0005P |
 |
A&E Design Requirements. Contract for Commissioning Services |
 |
Final List |
| 174 |
 |
8502005HW0043P |
 |
REI Services for the Construction of Roadways, Water Main, Sewer, Traffic and Street Lighting in Gateway Estates Area Phase 1B, Borough of Brooklyn |
 |
Final List |
| 175 |
 |
8502005SE0027P |
 |
REI Services for the Construction of Sanitary and Storm Sewers, and Water Mains in Harold Street, Borough of Staten Island Addendum 1, Posted 3/2/2005 (Original 03/08/2005 due Date extended to 03/15/2005) |
 |
Final List |
| 176 |
 |
8502005HW0038P |
 |
REI Services for the Construction of Citywide Pedestrian Ramps in the Borough of Queens |
 |
Final List |
| 177 |
 |
8502005HW0035P |
 |
REI Services for the Reconstruction of Havemeyer Avenue, Bronx Addendum 1, Posted 2/8/2005 |
 |
Final List |
| 178 |
 |
8502005SE0018P |
 |
REI Services for the Construction of Sanitary & Storm Sewers in Rossville Ave, S.I. |
 |
Final List |
| 179 |
 |
8502005HW0032P |
 |
REI Services for the Reconstruction of Columbia Street, Brooklyn |
 |
Final List |
| 180 |
 |
8502005HW0024P |
 |
REI Services for the Reconstruction of 32nd Street, Queens |
 |
Final List |
| 181 |
 |
8502005IN0001P |
 |
DEP Remsen Avenue Repair Facility Reconstruction |
 |
Final List |
| 182 |
 |
8502005IN0012P 8502005IN0013P 8502005IN0014P 8502005IN0015P 8502005IN0016P 8502005IN0017P 8502005IN0018P 8502005IN0019P 8502005IN0020P 8502005IN0021P 8502005IN0022P 8502005IN0023P 8502005IN0024P 8502005IN0025P 8502005IN0026P 8502005IN0027P 8502005IN0028P 8502005IN0029P 8502005IN0030P 8502005IN0031P 8502005IN0032P 8502005IN0033P 8502005IN0034P 8502005IN0035P |
 |
Arch. and Eng. Services for Small Projects within the Structures Division |
 |
Final List |
| 183 |
 |
8502005IN0004P 8502005IN0005P 8502005IN0006P 8502005IN0007P 8502005IN0008P 8502005IN0009P 8502005IN0010P 8502005IN0011P |
 |
Arch. and Eng. Services for Generic Projects within the Structures Division |
 |
Final List |