Search Email Updates Contact Us DDC Home Residents Business Visitors Government Office of the Mayor NYC.gov always open DDC Home DDC Home About DDC DDC Business In your Neighborhood Design Projects Contacts DDC Business
Open RFPs
Closed RFPs

The City of New York is committed to achieving excellence in the design and construction of its capital program, and building on the tradition of innovation in architecture and engineering that has contributed to the City's prestige as a global destination. As part of this effort, DDC is pleased to announce the following contracting opportunites:

Minority and Women-owned Business Enterprise (MWBE) Program Information
Design and Construction Excellence Program Information

 # PIN RFP SELECTED FIRMS
1 8502014RQ0008P
8502014RQ0009P
8502014RQ0010P
RQ_A&E Requirements Contracts for Architectural, Engineering and Construction Related Services for Roofing and/or Roof-Related Assemblies, Citywide
MWBE Goals, Posted 7/31/2014
Addendum 1, Posted 8/6/2014
August 14, 2014 Pre-Proposal Conference Attendance Sheet, Posted 8/18/2014
Pre-Proposal Conference Minutes August 14, 2014, Posted 8/20/2014
In Process
2
8502014HW0035P
8502014HW0036P
8502014HW0037P
8502014HW0038P
8502014HW0039P
8502014HW0040P
8502014HW0041P
8502014HW0042P
8502014HW0043P
8502014HW0044P
Requirements Contracts for Resident Engineering Inspection Services for Small Infrastructure Projects, Citywide
MWBE Goals, Posted 6/12/2014
Addendum 1, Posted 6/17/2014
In Process
3 8502014WM0020P Resident Engineering Inspection Services for the Reconstruction of West Street, Borough of Brooklyn.
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 6/10/2014
Addendum 1, Posted 6/12/2014
Addendum 2, Posted 6/18/2014
In Process
4
8502014HW0025P
8502014HW0026P
8502014HW0027P
8502014HW0028P
8502014HW0029P
8502014HW0030P
8502014HW0031P
8502014HW0032P
8502014HW0033P
8502014HW0034P
Resident Engineering Inspection Services for Large Infrastructure Projects, Citywide
MWBE Goals, Posted 6/5/2014
Addendum 1, Posted 6/12/2014
In Process
5 8502014WM0019P REI Services for Water Main Connection at Washington Square Park, Borough of Manhattan
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 5/12/2014
In Process
6 8502014RQ0005P
8502014RQ0006P
8502014RQ0007P
V.C.P. (FY14DDC1), Requirements Contract for Architectural, Engineering and Construction Related Services for Rehabilitation/Replacement of Facades/ Roofs/Roof Related and Window Assemblies, Citywide [CONTRACT #1 OF 3]
MWBE Goals, Posted 4/22/2014
Addendum 1, Posted 5/1/2014
May 5, 2014 Pre-Proposal Conference Attendance Sheet, Posted 5/6/2014
Addendum 2, Posted 5/6/2014
Pre-Proposal Conference Minutes May 5, 2014, Posted 5/7/2014
In Process
7 8502014VP0031P
8502014VP0032P
8502014VP0033P
RQ_A&E, Requirements Contracts for Landscape Architectural, Engineering and Construction Related Services for Various Projects, Citywide
MWBE Goals, Posted 3/6/2014
Addendum 1, Posted 3/17/2014
In Process
8 8502014VP0027P
8502014VP0028P
PW348-63, PW348-64, CM/Design/Build Services for Remediation of Petroleum Contaminated Sites, Boroughs of Manhattan, the Bronx, Brooklyn, Queens, Staten Island and Upstate New York
Addendum 1, Posted 3/4/2014
Pre-Proposal Conference Attendance Sheet, Posted 3/12/2014
Pre-Proposal Conference Minutes 3-11-14, Posted 3/17/2014
Addendum 2, Posted 3/18/2014
In Process
9 8502014WM0010P MED-598B, REI SERVICES FOR INSTALLATION OF TRUNK WATER MAINS IN WEST 30TH STREET, BET 10 AVE & 9 AV (SHAFT26B), PHASE 2, BOROUGH OF MANHATTAN
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment
MWBE Goals, Posted 2/18/2014
In Process
10 8502014HW0066P HWMP2020, Resident Engineering Inspection Services for the Reconstruction of 9th Avenue/Gansevoort Area,Borough of Manhattan
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment
MWBE Goals, Posted 2/12/2014
In Process
11 8502014HW0057P HWQ411B, Resident Engineering Inspection Services for the Reconstruction of Albert Road Area – Ozone Park Streets, Borough of Queens
MWBE Goals, Posted 1/21/2014
Addendum 1, Posted 1/24/2014
In Process
12 8502014PW0003P
8502014PW0004P
PW335ES15-16, Requirements Contract for Environmental and Laboratory Testing Services for various Capital Projects, Citywide
MWBE Goals, Posted 1/6/2014
Addendum 1, Posted 1/9/2014
Addendum 2, Posted 1/16/2014
January 17, 2014 Pre-Proposal Coference Attendance Sheet, Posted 1/22/2014
Minutes of January 17, 2014 Pre-Proposal Conference, Posted 1/24/2014
Addendum 3, Posted 1/29/2014
In Process
13 8502014VP0029P
8502014VP0030P
PW311S14A (FY14NDDC4), Requirements Contract for Geotechnical Engineering and Laboratory Testing Services, Citywide
MWBE Goals, Posted 12/4/2013
December 18, 2013 Pre-Proposal Attendance Sheet, Posted 12/19/2013
Minutes of December 18, 2013 Pre-Proposal Conference, Posted 12/24/2013
Final List
14 8502014VP0021P
8502014VP0022P
8502014VP0023P
8502014VP0024P
8502014VP0025P
(ARCCW01), REQUIREMENTS CONTRACTS FOR LANDSCAPE ARCHITECTURAL SERVICES FOR VARIOUS INFRASTRUCTURE PROJECTS, CITYWIDE(5 contracts) [CONTRACT #1 OF 5]
MWBE Goals, Posted 11/4/2013
Addendum 1, Posted 11/19/2013
November 20, 2013 Pre-Proposal Conference Attendance Sheet, Posted 11/20/2013
Addendum 2, Posted 11/21/2013
Minutes of November 20, 2013 Pre-Proposal Conference, Posted 11/29/2013
In Process
15
8502014VP0011P
8502014VP0012P
8502014VP0013P
8502014VP0014P
8502014VP0015P
8502014VP0016P
8502014VP0017P
8502014VP0018P
8502014VP0019P
8502014VP0020P
REQUIREMENTS CONTRACT FOR ENGINEERING DESIGN AND RELATED SERVICES FOR LARGE INFRASTRUCTURE PROJECTS, CITYWIDE
MWBE Goals, Posted 10/10/2013
October 24, 2013 Pre-Proposal Conference Attendance Sheet, Posted 10/24/2013
Addendum 1, Posted 11/1/2013
Minutes of the October 24, 2013 Pre-Proposal Conference, Posted 11/1/2013
In Process
16
8502014VP0001P
8502014VP0002P
8502014VP0003P
8502014VP0004P
8502014VP0005P
8502014VP0006P
8502014VP0007P
8502014VP0008P
8502014VP0009P
8502014VP0010P
REQUIREMENTS CONTRACTS FOR ENGINEERING DESIGN AND RELATED SERVICES FOR SMALL INFRASTRUCTURE PROJECTS, CITYWIDE
MWBE Goals, Posted 10/10/2013
October 24, 2013 Pre-Proposal Conference Attendance Sheet, Posted 10/24/2013
Addendum 1, Posted 11/1/2013
Minutes of the Ocober 24, 2013 Pre-Proposal Conference, Posted 11/1/2013
Final List
17 8502014RQ0003P REQUIREMENTS CONTRACT FOR APPRAISAL SERVICES FOR VARIOUS PROJECTS - CITYWIDE Final List
18 8502014RQ0002P REQUIREMENTS CONTRACT FOR TITLE SEARCHING SERVICES FOR VARIUOS PROJECTS - CITYWIDE In Process
19 8502014CR0002P Construction Management Services for 1537-Bed New Admission Facility at Rikers Island.
MWBE Goals, Posted 9/26/2013
Pre-Proposal Conference Minutes, Posted 10/15/2013
Addendum 1, Posted 10/17/2013
In Process
20 8502013HW0074P Resident Engineering Inspection Services for the Reconstruction of Worth Street, Borough of Manhattan
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
In Process
21 8502013HW0078P HWK1668A, Pre-Scoping Services Willoughby Street Limited Access Streetscape, Borough of Brooklyn
MWBE Goals, Posted 8/19/2013
Addendum 1, Posted 8/20/2013
In Process
22 8502013TR0007P S216-404A, Architectural and Engineering Design and Construction Related Services for the New Gansevoort Marine Transfer Station, Borough of Manhattan
MWBE Goals, Posted 8/15/2013
Addendum 1, Posted 8/21/2013
Pre-Proposal Conference Minutes, Posted 9/3/2013
In Process
23 8502013SE0029P SE818, REI SERVICES FOR CONSTRUCTION OF SANITARY AND STORM SEWERS, WATER MAINS, APPURTENANCES AND BEST MANAGEMENT PRACTICE STRUCTURE IN SHELDON AVENUE, BOROUGH OF STATEN ISLAND
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 5/10/2013
Final List
24 8502013HW0060P HWQ121B3, ENGINEERING DESIGN SERVICES FOR THE RECONSTRUCTION OF STREETS IN SOUTH JAMAICA AREA, BOROUGH OF QUEENS
Addendum 1, Posted 5/9/2013
Addendum 2, Posted 5/23/2013
MWBE Goals, Posted 5/23/2013
Final List
25 8502013SE0025P SEQ200483, Resident Engineering Inspection Services for the Installation of Storm, Combined Sewers, Water Mains and Outfall in Hook Creek Blvd., Borough of Queens
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 4/30/2013
Final List
26 8502013HW0063P HD-161D, Resident Engineering Inspection Services for the Reconstruction of Gateway Estate Area-Phase D, Borough of Brooklyn
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 4/25/2013
Addendum 1, Posted 5/13/2013
Final List
27 8502013WM0013P
8502013WM0014P
RESIDENT ENGINEERING INSPECTION SERVICES FOR WATER MAIN WORK IN VARIOUS LOCATIONS, BOROUGH OF QUEENS
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 4/22/2013
Final List
28 8502013HW0058P Pre-Scoping Services for the Porpoise Bridge in Flushing Meadows-Corona Park, Borough of Queens
MWBE Goals, Posted 4/10/2013
Addendum 1, Posted 5/2/2013
Final List
29 8502013HW0052P
8502013HW0053P
8502013HW0054P
8502013HW0055P
8502013HW0056P
8502013HW0057P
RESIDENT ENGINEERING INSPECTION SERVICES FOR PRIOR NOTICE SIDEWALKS, BOROUGHS OF QUEENS, BROOKLYN, BRONX, MANHATTAN, CITYWIDE AND STATEN ISLAND
MWBE Goals, Posted 4/1/2013
Addendum 1, Posted 4/2/2013
Addendum 2, Posted 4/4/2013
Addendum 3, Posted 4/15/2013
Final List
30 8502013HW0045P
8502013HW0046P
8502013HW0047P
REQUIREMENTS CONTRACTS FOR LANDSCAPE ARCHITECTURAL SERVICES FOR INFRASTRUCTURE PROJECTS, BOROUGHS OF MANHATTAN, BRONX, BROOKLYN, STATEN ISLAND AND QUEENS
MWBE Goals, Posted 3/11/2013
Addendum 1, Posted 3/27/2013
Pre-Proposal Conference Minutes, Posted 4/1/2013
Addendum 2, Posted 4/2/2013
Final List
31 8502013SE0018P REI SERVICES FOR THE REPLACEMENT OF COMBINED SEWER IN CALAMUS AVENUE
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 2/26/2013
Addendum 1, Posted 3/12/2013
Final List
32 8502013VP0008P
8502013VP0009P
8502013VP0010P
REQUIREMENTS CONTRACTS FOR ENGINEERING DESIGN AND RELATED SERVICES FOR LARGE INFRASTRUCTURE PROJECTS
MWBE Goals, Posted 12/18/2012
Addendum 1, Posted 1/4/2013
Addendum 2, Posted 1/11/2013
Pre-Proposal Conference Minutes, Posted 1/11/2013
Final List
33 8502013SE0003P
8502013SE0004P
Requirement Contract for Engineering Design and Related Services in Connection with Green Infrastructure Work, Boroughs of Queens and the Bronx
MWBE Goals, Posted 12/13/2012
Addendum 1, Posted 12/20/2012
Addendum 2, Posted 12/31/2012
Addendum 3, Posted 1/7/2013
Addendum 4, Posted 1/11/2013
Final List
34 8502013VP0011P
8502013VP0012P
8502013VP0013P
DESIGN REQUIREMENT CONTRACT - MANHATTAN AND BRONX (Small Contracts) [CONTRACT #1 OF 3]
MWBE Goals, Posted 11/15/2012
Pre-Proposal Conference Minutes, Posted 12/11/2012
Final List
35 8502013HW0014P REI SERVICES RECONSTRUCTION OF GRAND CONCOURSE SERVICE ROADS
MWBE Goals, Posted 10/22/2012
Addendum 1, Posted 10/23/2012
Addendum 2, Posted 11/15/2012
Final List
36 8502013HW0019P Pre-Scoping Services for the Reconstruction of Hunters Point Area, Long Island City, Queens
MWBE Goals, Posted 10/2/2012
Addendum 1, Posted 10/31/2012
Addendum 2, Posted 11/2/2012
In Process
37 8502012VP0005P RQ_A & E, Requirements Contract for Special Inspection and Laboratory Services for Various Projects, Citywide
MWBE Goals, Posted 8/13/2012
Addendum 1, Posted 8/24/2012
Pre-Proposal Conference Meeting Minutes, Posted 8/29/2012
Final List
38 8502013WM0001P MED600B, Resident Engineering Inspection Services for Trunk Water Mains in 58th Street to Connect Shaft 33B to the Distribution System, Borough of Manhattan
MWBE Goals, Posted 8/8/2012
Addendum 1, Posted 8/13/2012
In Process
39 8502012HW0052P HBPED700Q, Pre-Scoping Design Services for the Passerelle Pedestrian Bridge, Borough of Queens
MWBE Goals, Posted 7/18/2012
Final List
40
8502012VP0008P
8502012VP0009P
8502012VP0010P
8502012VP0011P
8502012VP0012P
8502012VP0013P
8502012VP0014P
8502012VP0015P
8502012VP0016P
8502012VP0017P
8502012VP0018P
8502012VP0019P
8502012VP0020P
8502012VP0021P
8502012VP0022P
8502012VP0023P
8502012VP0024P
8502012VP0025P
8502012VP0026P
8502012VP0027P
RFP-20, Twenty Architectural and Engineering Design Requirements Contracts for Small Projects, Citywide
MWBE Goals, Posted 7/9/2012
Addendum 1, Posted 7/20/2012
Pre-Proposal Conference Minutes, Posted 7/31/2012
Addendum 2, Posted 8/7/2012
Final List
41 8502012TR0006P S216-415A, Construction Management Services for the Renovation and Rehabilitation of the West 59th Street Marine Transfer Station, Borough of Manhattan
MWBE Goals, Posted 7/12/2012
Addendum 1, Posted 7/23/2012
Addendum 2, Posted 7/24/2012
Addendum 3, Posted 7/27/2012
Addendum 4, Posted 7/27/2012
Pre-Proposal Conference Minutes, Posted 8/1/2012
Final List
42 8502012HW0055P HW349FED, Resident Engineering Inspection Services for Resurfacing, Pavement Improvements and General Repairs at Various Locations within Brooklyn, the Bronx and Queens Final List
43 8502012VP0028P
8502012VP0029P
8502012VP0030P
8502012VP0031P
8502012VP0032P
8502012VP0033P
RFP-6, Six Architectural and Engineering Design Requirements Contracts for Large Projects, Citywide
MWBE Goals, Posted 7/9/2012
Addendum 1, Posted 7/20/2012
Pre-Proposal Conference Minutes, Posted 7/31/2012
Final List
44 8502012HW0049P Resident Engineering Inspection Services for the Reconstruction of Times Square Area
MWBE Goals, Posted 6/13/2012
Addendum 1, Posted 6/18/2012
Final List
45 8502012HW0046P HD-161C, Resident Engineering Inspection Services for the Reconstruction of the Gateway Estates Area - Phase C, Borough of Brooklyn
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 5/8/2012
Addendum 1, Posted 5/15/2012
Addendum 2, Posted 5/22/2012
Final List
46 8502012RQ0004P Requirements Contract for Topographical Surveying Services for Various Infrastructure Projects, Borough of Manhattan
MWBE Goals, Posted 5/4/2012
Addendum 1, Posted 5/9/2012
Pre-Prosposal Conference Minutes, Posted 5/24/2012
In Process
47 8502012RQ0003P Requirements Contract for Topographical Surveying Services for Various Infrastructure Projects, Borough of Brooklyn
MWBE Goals, Posted 5/4/2012
Addendum 1, Posted 5/9/2012
Pre-Proposal Conference Minutes, Posted 5/24/2012
Final List
48 8502012RQ0006P Requirements Contract for Topographical Surveying Services for Various Infrastructure Projects, Borough of The Bronx
MWBE Goals, Posted 5/4/2012
Addendum 1, Posted 5/9/2012 (Addendum No. 1)
Addendum 2, Posted 5/17/2012
Pre-Prosposal Conference Minutes, Posted 5/24/2012
Final List
49 8502012RQ0001P Requirements Contract for Topograghical Surveying Services for Various Infrastructures Projects, Borough of Staten Island
MWBE Goals, Posted 4/30/2012
Addendum 1, Posted 5/9/2012
Pre-Proposal Conference Minutes, Posted 5/24/2012
Final List
50 8502012RQ0002P Requirements Contract for Topographical Surveying Services for Various Infrastructures Projects, Borough of Queens
MWBE Goals, Posted 4/30/2012
Addendum 1, Posted 5/9/2012
Pre-Prosposal Conference Minutes, Posted 5/24/2012
Final List
51 8502012HW0040P Resident Engineering Inspection Services for the Reconstruction of Broadway, Phase 1, Borough of Manhattan
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
Addendum 1, Posted 5/9/2012
Final List
52 8502012WM0011P Resident Engineering Inspection Services for Water Main Replacement at Various Locations , Borough of Queens
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 3/26/2012
Addendum 1, Posted 4/18/2012 (Addendum No. 1 _8502012WM0011P)
Final List
53 8502012HW0033P FINAL DESIGN SERVICES FOR THE RECONSTRUCTION OF BERGEN AVENUE AREA, BKLYN
MWBE Goals, Posted 3/6/2012
Final List
54 8502012HW0024P Preliminary and Final Design Services for Brookville Blvd. and Edgewood Triangle
MWBE Goals, Posted 2/13/2012
Addendum 1, Posted 3/2/2012
Final List
55 8502012VP0001P JOCS-DDC, Requirements Contract for Job Order Contracting System in Connection with Various Capital Projects, Citywide
Addendum 1, Posted 2/16/2012
Pre-Proposal Conference Meeting Minutes, Posted 2/24/2012
Addendum 2, Posted 2/29/2012
Appendix 2 - Job Order Contract Technical Specifications (Part 1), Posted 2/29/2012
Appendix 2 - Job Order Contract Technical Specifications (Part 2), Posted 2/29/2012
Appendix 3 - Job Order Contract Construction Task Catalog, Posted 2/29/2012
Addendum 3, Posted 3/8/2012
Final List
56 8502011VP0042P
8502011VP0043P
8502011VP0044P
Requirements Contract for CM Services, Citywide for Transportation Unit [CONTRACT #1 OF 3]
MWBE Goals, Posted 11/4/2011
Pre-Proposal Conference Meeting for November 28, 2011, Posted 12/5/2011
Addendum 1, Posted 12/5/2011
Final List
57 8502012SE0005P SE-807, Preliminary and Final Design Services for the Installation of Storm and Sanitary Sewers on 20th Ave., between 126th St. and U.S. Bulkhead Line Area and Water Main Replacement in College Point Blvd., between 11th and 22nd Avenues, Borough of Queens
MWBE Goals, Posted 11/2/2011
Addendum 1, Posted 11/3/2011
Addendum 2, Posted 11/9/2011
Addendum 3, Posted 11/23/2011
Final List
58 8502012WM0001P MED-598, Resident Engineering Inspection Services for the Installation of Trunk Water Mains on 10th Avenue, Borough of Manhattan
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 8/24/2011
Final List
59 8502011HW0059P PRELIMINARY AND FINAL DESIGN SERVICES FOR THE RECONSTRUCTION OF LAKEVIEW BLVD. EAST, SOUTH JAMAICA AREA, BOROUGH OF QUEENS
MWBE Goals, Posted 8/15/2011
Addendum 1, Posted 8/24/2011
Final List
60 8502011HW0053P HWRC054-R. REI SERVICES FOR HYLAN BOULEVARD INTERSECTION IMPROVEMENT, BOROUGH OF STATEN ISLAND
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 8/1/2011
Addendum 1, Posted 8/17/2011
Addendum 2, Posted 8/26/2011
Final List
61 8502011HW0056P P-5FRESHU, Preliminary Design Services for Improvements to the West Shore Expressway Service Roads and Fresh Kills Park Road, in the Borough of Staten Island
MWBE Goals, Posted 7/27/2011
Addendum 1, Posted 8/10/2011
Addendum 2, Posted 8/16/2011
Pre-Proposal Conference Meeting Minutes for August 11, 2011, Posted 8/18/2011
Bridge Inspection Report, Posted 8/18/2011
Final List
62 8502011VP0041P RESIDENT ENGINEERING INSPECTION SERVICES FOR THE REHABILITATION OF HIGH BRIDGE, BOROUGHS OF MANHATTAN AND THE BRONX
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
Addendum 1, Posted 7/29/2011
Addendum 2, Posted 8/2/2011
Addendum 3, Posted 8/10/2011
Final List
63 8502011RQ0008P
8502011RQ0009P
8502011RQ0010P
8502011RQ0011P
8502011RQ0012P
PW311STLS, Five Requirements Contracts for Topographical Surveying Services for Various Structures Projects, Boroughs of Staten Island, Queens, Brooklyn, Manhattan, and The Bronx
MWBE Goals, Posted 7/14/2011
Addendum 1, Posted 7/22/2011
Addendum 2, Posted 7/28/2011
Pre-Proposal Conference Minutes, Posted 8/3/2011
Final List
64 8502011SE0046P SE-796, Resident Engineering Inspection Services for the Installation of New Storm and Sanitary Sewers in Richmond Valley Road, Staten Island
The design plan for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 7/13/2011
Addendum 1, Posted 7/19/2011
Addendum 2, Posted 7/25/2011
Final List
65 8502011VP0045P ENGINSP4, REQUIREMENTS CONTRACT FOR PROFESSIONAL SERVICES FOR INSPECTION AND MATERIAL TESTING OF WATER MAIN AND SEWER PIPES AND APPURTENANCES AT VARIOUS LOCATIONS THROUGHOUT THE UNITED STATES AND FOREIGN COUNTRIES
Pre-Proposal Conference Minutes, Posted 8/1/2011
Final List
66 8502011SE0045P Resident Engineering Inspection Services for the Installation of Storm and Sanitary Sewers and Water Mains in the McBaine Avenue Area, Borough of Staten Island
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 7/5/2011
Addendum 1, Posted 7/19/2011
Addendum 2, Posted 7/25/2011
Final List
67 8502011SE0035P SE-817, Resident Engineering Inspection Services for the Installation of Storm and Sanitary Sewers in Beach 29th Street, in the Borough of Queens
MWBE Goals, Posted 6/20/2011
Addendum 1, Posted 6/21/2011
Addendum 2, Posted 6/27/2011
Addendum 3, Posted 7/6/2011
Final List
68 8502011PW0018P
8502011PW0019P
Requirements Contract for Geotechnical Engineering Services for Various Projects, Citywide
Pre-Proposal Conference Minutes, Posted 7/12/2011
Final List
69 8502011HW0046P PRELIMINARY AND FINAL DESIGN SERVICES FOR THE RECONSTRUCTION OF THE TILLARY STREET AREA, IN THE BOROUGH OF BROOKLYN Final List
70 8502011HW0051P PRELIMINARY AND FINAL DESIGN SERVICES FOR THE RECONSTRUCTION OF BLOOMINGDALE ROAD FROM ARTHUR KILL ROAD TO AMBOY ROAD, BOROUGH OF STATEN ISLAND
MWBE Goals, Posted 4/26/2011
Addendum 1, Posted 5/12/2011
Final List
71 8502011SE0034P RESIDENT ENGINEERING INSPECTION SERVICES FOR SANITARY AND STORM SEWERS INSTALLATION IN CHANDLER STREET, BOROUGH OF QUEENS
The design plans for this project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 4/21/2011
Final List
72 8502011VP0039P
8502011VP0040P
CONSTRUCTION MANAGEMENT/DESIGN/BUILD FOR REMOVAL/UPGRADE/REPLACEMENT OF CITY-OWNED HEATING OIL TANKS AT VARIOUS SITES, CITYWIDE
Addendum 1, Posted 5/4/2011
Pre-Proposal Conference Minutes, Posted 5/10/2011
Final List
73 8502011WM0005P REI SERVICES FOR THE INSTALLATION OF WATER MAINS IN VERMONT PLACE BETWEEN CYPRESS AVENUE AND JACKIE ROBINSON PARKWAY, BOROUGH OF QUEENS AND IN THE CORLEAR AVENUE AND 238TH STREET AREA, BOROUGH OF THE BRONX
The design plans for this project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 4/5/2011
Final List
74 8502011VP0010P
8502011VP0011P
8502011VP0012P
8502011VP0013P
8502011VP0014P
Requirements Contract for Five Engineering And Construction Related Design Services For Renovation Projects Involving HVAC, Fire Protection,Electrical And Plumbing
MWBE Goals, Posted 3/8/2011
Addendum 1, Posted 3/24/2011
Addendum 2, Posted 4/1/2011
Final List
75 8502011HW0038P HWK1129, Resident Engineering Inspection Services for the Reconstruction of Nostrand Avenue, from Flushing Ave to Atlantic Ave, Borough of Brooklyn
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 3/2/2011
Final List
76
8502011VP0032P
8502011VP0033P
8502011VP0034P
8502011VP0035P
8502011VP0036P
8502011VP0037P
8502011VP0038P
HWCRQ2L, Seven Requirements Contracts for Resident Engineering Inspection Services for Large Infrastructure Projects, Citywide
MWBE Goals, Posted 2/28/2011
Addendum 1, Posted 3/4/2011
Final List
77 8502011SE0022P SE-809, Resident Engineering Inspection Services for the Installation of Storm & Sanitary Sewers along the Whitestone Expressway Service Road, Borough of Queens
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 2/22/2011
Addendum 1, Posted 3/2/2011
In Process
78 8502011CR0002P C114NEWRI, A&E Design Services for the New Rikers Island 1,500 Bed Admissions Facility
MWBE Goals, Posted 2/16/2011
Addendum 1, Posted 2/17/2011
Addendum 2, Posted 2/18/2011
Addendum 3, Posted 3/10/2011
Pre-Proposal Conference Minutes, Posted 3/10/11, Posted 3/10/2011
Final List
79
8502011VP0015P
8502011VP0016P
8502011VP0017P
8502011VP0018P
8502011VP0019P
8502011VP0020P
8502011VP0021P
HWCRQ02S, Seven Requirements Contracts for Resident Engineering Inspection Services for Small Infrastructure Projects, Citywide
MWBE Goals, Posted 2/11/2011
Addendum 1, Posted 2/22/2011
Addendum 2, Posted 3/4/2011
Final List
80 8502011HW0029P HWMP2020, Design Services for the Reconstruction of 9th Avenue/Ganesvoort Area, Borough of Manhattan
Addendum 1, Posted 1/5/2011
Addendum 2, Posted 1/7/2011
Addendum 3, Posted 1/10/2011
Addendum 4, Posted 1/28/2011
Final List
81 8502011WM0002P CITYWIDE DESIGN REQUIREMENT CONTRACT - TRUNK MAIN CORROSION CONTROL
Addendum 1, Posted 12/29/2010
Addendum 2, Posted 1/7/2011
Addendum 3, Posted 1/19/2011
Final List
82 8502011WM0003P ROCKAWAY BEACH BOULEVARD - BEACH 90 ST AND BEACH 94 ST
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 12/13/2010
Addendum 1, Posted 12/15/2010
Addendum 2, Posted 12/28/2010
Final List
83 8502011VP0009P Requirements Contract for Professional Services for Environmental Assessment Statements for Various Projects, Citywide
MWBE Goals, Posted 12/7/2010
Addendum 1, Posted 12/15/2010
Addendum 2, Posted 12/21/2010
Final List
84 8502011VP0005P CM/Design/Build for Purchase and Installation of New Asphalt Plant Equipment for the Hamilton Avenue Asphalt Plant, Operated by NYC Department of Transportation, Borough of Brooklyn
Addendum 1, Posted 12/10/2010
Pre-proposal Conference Minutes, Posted 12/14/2010
Final List
85 8502011SE0008P Resident Engineering Inspection Services for the Construction of Roadways, Curbs, Sidewalks, Watermains Storms and Sanitary Sewers in Edgemere Area (PHASE C2), Borough of Queens
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 10/27/2010
Final List
86 8502011HW0015P
8502011HW0016P
8502011HW0017P
8502011HW0018P
8502011HW0019P
Resident Engineering Inspection Services for Prior Notice Sidewalks in the Boroughs of Brooklyn and Staten Island, Queens, Citywide, The Bronx and Manhattan
MWBE Goals, Posted 10/5/2010
Final List
87 8502010WM0020P REI Services for Trunk Water Mains at 8th Avenue from West 12th Street to West 13th Street, Borough of Manhattan
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 8/6/2010
Addendum 1, Posted 8/11/2010
In Process
88 8502010WM0019P REI Services for the Construction of Trunk Water Mains at West 60th Street from West End Avenue to Columbus Avenue, Boroough of Manhattan
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 7/30/2010
Addendum 1, Posted 8/5/2010
Addendum 2, Posted 8/11/2010
Addendum 3, Posted 8/12/2010
In Process
89 8502010WM0016P REI Services for Trunk Water Mains in Grand Street from Broadway to Essex Street, Borough of Manhattan
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 7/26/2010
Addendum 1, Posted 8/11/2010
Addendum 2, Posted 8/12/2010
In Process
90 8502010WM0017P REI Services for Trunk Water Mains in West 48th Street from 10th Avenue to Broadway, Borough of Manhattan
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 7/19/2010
Addendum 1, Posted 7/23/2010
Addendum 2, Posted 7/26/2010
Addendum 3, Posted 8/5/2010
Addendum 4, Posted 8/11/2010
Addendum 5, Posted 8/12/2010
In Process
91 8502010RQ0002P HWDRWALLF, Requirements Contract for Engineering Design and Related Services for Retaining Walls, Citywide
MWBE Goals, Posted 4/9/2010
Addendum 1, Posted 4/9/2010
Addendum 2, Posted 4/28/2010
Addendum 3, Posted 5/19/2010
Addendum 4, Posted 5/28/2010
Final List
92 8502010WM0008P MED599, Resident Engineering Inspection Services for Trunk Water Mains in West 48th Street from 10th Avenue to Broadway, Borough of Manhattan
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 3/4/2010
Addendum 1, Posted 3/24/2010
In Process
93 8502010HW0046P HWS2010Q, HWS2010K, HWS2010X, HWS2010M, Resident Engineering Inspection Services for Prior Notice Sidewalks, Boroughs of Queens, Brooklyn, Bronx and Manhattan
MWBE Goals, Posted 2/9/2010
Addendum 1, Posted 2/17/2010 (Addendum No. 1)
Final List
94 8502010HW0037P HW2CR11A, Resident Engineering Inspection Services for Street Milling, Citywide
MWBE Goals, Posted 2/3/2010
Addendum 1, Posted 2/17/2010 (Addendum No. 1)
Final List
95 8502010HW0042P HWP2010MX, HWP2010R , HWP2010CW, Resident Engineering Inspection Services for the Construction of Pedestrian Ramps, Boroughs of the Bronx & Manhattan, Staten Island and Citywide.
MWBE Goals, Posted 1/26/2010
Addendum 1, Posted 2/16/2010 (Addendum No. 1)
Final List
96 8502010WM0003P Resident Engineering Inspection Services for Trunk Water Mains in East 59th Street Between 1st and 3rd Avenue, Borough of Manhattan
MWBE Goals, Posted 11/20/2009
Addendum 1, Posted 12/3/2009
Addendum 2, Posted 12/4/2009 (The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.)
Final List
97 8502010HW0014P HWD105-01, Resident Engineering Inspection for the Reconstruction of Metropolitan Avenue and Unionport Road Medians in Parkchester Area, Borough of the Bronx
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment
MWBE Goals, Posted 9/22/2009
Final List
98 8502010HW0013P Resident Engineering Inspection Services for the Reconstruction of Pratt Avenue Area, Borough of the Bronx
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 9/9/2009
Final List
99 8502009VP0041P Construction Management/ Design/ Build for the Removal/ Upgrade/ Replacement of City-Owned Petroleum Storage Tanks, Citywide
Pre-proposal Conference Minutes, Posted 9/23/2009
Addendum 1, Posted 9/23/2009
Final List
100 8502009PW0005P Requirements Contract for Environmental Services for Various Projects, Citywide
MWBE Goals, Posted 8/5/2009
Addendum 1, Posted 8/19/2009
Pre-Proposal Conference August 17, 2009 Minutes, Posted 8/25/2009
Final List
101 8502009HW0060P Resident Engineering Inspection Services for the Reconstruction of Eastern Parkway,Borough of Brooklyn
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 7/28/2009
Final List
102 8502009HW0059P Resident Engineering Inspection Services for the Reconstruction of Nassau Avenue, Borough of Brooklyn
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 7/23/2009
Addendum 1, Posted 7/27/2009
Final List
103 8502009HW0053P RESIDENT ENGINEERING INSPECTION SERVICES AND MINOR DESIGN SERVICES FOR THE RECONSTRUCTION AND REPLACEMENT OF COMPLEX PEDESTRIAN RAMPS FOR THE BOROUGHS OF QUEENS, BROOKLYN, MANHATTAN AND THE BRONX
MWBE Goals, Posted 6/18/2009
In Process
104 8502009HW0051P RESIDENT ENGINEERING INSPECTION SERVICES FOR THE RECONSTRUCTION OF EAST HOUSTON STREET
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 6/8/2009
Final List
105
8502009VP0010P
8502009VP0011P
8502009VP0012P
8502009VP0013P
8502009VP0014P
8502009VP0015P
8502009VP0016P
8502009VP0017P
8502009VP0018P
8502009VP0019P
8502009VP0020P
8502009VP0021P
8502009VP0022P
8502009VP0023P
8502009VP0024P
8502009VP0025P
8502009VP0026P
8502009VP0027P
8502009VP0028P
8502009VP0029P
RQ_A&E, Twenty Architectural & Engineering Design Requirements Contracts for Small Projects, Citywide
MWBE Goals, Posted 4/15/2009
Addendum 1, Posted 5/1/2009
Pre-Proposal Conference minutes, Posted 5/1/2009
Addendum 2, Posted 5/8/2009
Final List
106
8502009VP0030P
8502009VP0031P
8502009VP0032P
8502009VP0033P
8502009VP0035P
8502009VP0034P
8502009VP0036P
8502009VP0037P
RQ_A&E, Eight Architectural & Engineering Design Requirements Contracts for Large Projects, Citywide
MWBE Goals, Posted 4/15/2009
Addendum 1, Posted 5/1/2009
Pre-Proposal Conference minutes, Posted 5/1/2009
Addendum 2, Posted 5/8/2009
Final List
107 8502009HW0041P
8502009HW0042P
8502009HW0043P
8502009HW0044P
RESIDENT ENGINEERING INSPECTION SERVICES FOR PRIOR NOTICE SIDEWALKS FOR THE BOROUGHS OF QUEENS, MANHATTAN, THE BRONX AND STATEN ISLAND
MWBE Goals, Posted 3/26/2009
Final List
108 8502009HW0046P RESIDENT ENGINEERING SERVICES RECONSTRUCTION OF CHAMBERS STREET, ETC
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
Final List
109 8502009HW0045P RESIDENT ENGINEERING INSPECTION SERVICES FOR RECONSTRUCTION OF PAULDING AVE AREA - PHASE II
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 3/12/2009
Final List
110 8502009PV0007P P-213 CNTR, Construction Management Services for the Coney Island Center, Borough of Brooklyn
Addendum 1, Posted 2/11/2009
Pre-Proposal Conference Minutes, Posted 2/13/2009
Final List
111 8502009CR0002P New Bronx Detention Complex at Hunts Point, Borough of the Bronx
MWBE Goals, Posted 1/20/2009
Addendum 1, Posted 1/23/2009
Addendum 2, Posted 1/23/2009
Pre-Proposal Conference minutes, Posted 2/9/2009
In Process
112 8502009VP0006P Construction Management_Design_Build for Remediation and Monitoring of City-Owned Petroleum Contaminated Sites, Citywide and Upstate New York
MWBE Goals, Posted 12/17/2008
Pre-Proposal Conference minutes, Posted 1/9/2009
Addendum 1, Posted 1/9/2009
Final List
113 8502009VP0001P 8502009VP0001-2P – Design Requirements Contracts for Commissioning Services, Contract #1 and #2
minutes of September 22, 2008 Pre-Proposal Conference, Posted 9/26/2008
Final List
114 8502008HW0072P Resident Engineering Inspection Services for the Reconstruction of Pelham Parkway: West & East Bounds and North & South Bounds, Borough of the Bronx
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 8/13/2008
Addendum 1, Posted 8/22/2008
Addendum 2, Posted 8/28/2008
Final List
115 8502008PW0013P Requirements Contract for Geotechnical Inspection Services, Citywide
Addendum 1, Posted 8/22/2008
Minutes of August 18, 2008 Pre-Proposal Conference, Posted 8/22/2008
Final List
116 8502008CR0017P Consultant for Architectural, Engineering Design and Services during Construction for James A. Thomas Center, Reconstruction Phase II, Rikers Island
MWBE Goals, Posted 6/23/2008
Minutes of July 11, 2008, Posted 7/18/2008
Addendum 1, Posted 7/18/2008
Final List
117 8502008RQ0033P 8502008RQ00033-34P – Requirements Contract for Historic Preservation Design, Architecture, Engineering and Construction Related Services, Citywide
MWBE Goals, Posted 6/9/2008
Minutes of June 24, 2008 Pre-Proposal Conference, Posted 7/3/2008
Addendum 1, Posted 7/3/2008
Final List
118 8502008RQ0006P Requirements Contracts for Resident Engineering Inspection Services for Twelve Contracts, Citywide
MWBE Goals, Posted 6/3/2008
Addendum 1, Posted 6/24/2008
Final List
119 8502008PD0009P Construction Management/ Build Services for the Construction of the New Police Academy, Borough of Queens
Pre-Proposal Conference Minutes, Posted 6/10/2008
Final List
120 8502008RQ0032P Requirements Contract for Environmental Services for Various Capital Projects Citywide
MWBE Goals, Posted 4/2/2008
Addendum 1, Posted 4/11/2008
Addendum 2, Posted 4/28/2008
Minutes of 4/17 Pre-Proposal Conference, Posted 4/28/2008
Addendum 3, Posted 4/30/2008
Final List
121 8502008PW0006P Requirements Contract for Environmental Services for Various Capital Projects, Citywide
MWBE Goals, Posted 4/9/2008
Minutes of 4/17 Pre-Proposal Conference, Posted 4/28/2008
Addendum 1, Posted 5/1/2008
Final List
122 8502008VP0009P Requirements Contracts for Building Envelope Design, Engineering and Construction Related Services
Addendum 1, Posted 4/24/2008
Minutes of 4/21/08 Pre-Proposal Conference, Posted 4/24/2008
Final List
123 8502008HW0045P Design of Hudson Park and Boulevard and Streetscape for Hudson Yards Area
Addendum 1, Posted 4/2/2008
Addendum 2, Posted 4/7/2008
Addendum 3, Posted 4/16/2008
Minutes of 4/8 Pre-Proposal Conference, Posted 4/16/2008
Final List
124 8502008RQ0023P Eight Engineering Design and Related Services Requirements Contracts, Citywide
MWBE Goals, Posted 3/24/2008
Addendum 1, Posted 4/15/2008
Minutes of 4/8 Pre-Proposal Conference, Posted 4/15/2008
Final List
125 8502008HW0052P Resident Engineering Inspection Services for Milling Projects Involving Grinding Existing Asphaltic Concrete Wearing Courses for the Boroughs of Brooklyn, Staten Island, Manhattan, the Bronx and Queens
MWBE Goals, Posted 3/20/2008
Final List
126 8502008FI0001P Construction Management/ Build Services for the Construction of New Emergency Medical Service Station, Borough of the Bronx
Addendum 1, Posted 4/4/2008
Minutes Pre-Proposal Conference, Posted 4/4/2008
Final List
127 8502008HW0040P Resident Engineering Inspection Services for Prior Notice Sidewalks for the Boroughs of Queens, Brooklyn, the Bronx and Manhattan
MWBE Goals, Posted 3/17/2008
Final List
128 8502008PD0002P Construction Management/ Build Services for the Construction of the NYPD/FDNY/DoITT Public Safety Answering Center II (PSACII), Borough of the Bronx
Addendum 1, Posted 3/20/2008
Addendum 2, Posted 3/27/2008
Addendum 3, Posted 4/10/2008
Minutes of 4/2/08 Pre-Proposal Conference, Posted 4/10/2008
Final List
129 8502008CR0014P Renovation and Expansion of the Brooklyn Detention Center, Borough of Brooklyn
MWBE Goals, Posted 3/13/2008
Addendum 1, Posted 3/21/2008
Addendum 2, Posted 4/2/2008
Pre-Proposal Conference Notes, Posted 4/2/2008
Addendum 3, Posted 4/7/2008
Final List
130 8502008PD0008P Construction of New 121st Street Precinct, STATEN ISLAND
Minutes of Pre-Proposal Conference, Posted 4/1/2008
Addendum 1, Posted 4/1/2008
Final List
131 8502008HW0055P HW2CR08CW, Resident Engineering Inspection Services for Milling, Citywide
MWBE Goals, Posted 3/3/2008
Final List
132 8502008VP0011P Requirements Contract for Forensic Engineering and Construction Related Services for Building Systems, Citywide
Addendum 1, Posted 3/4/2008
Minutes of Pre-Proposal Meeting-March 10, 2008, Posted 3/18/2008
Final List
133 8502008RQ0031P RQ_PO, Requirements Contract for Cost Management and Cost Estimating Services for Various Projects, Citywide
Addendum 1, Posted 3/11/2008
Addendum 2, Posted 3/20/2008
Final List
134 8502008HW0050P REI SERVICES FOR THE RECONSTRUCTION OF WEST 33RD STREET BETWEEN 10TH AVE & 11TH AVE
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 1/22/2008
Addendum 1, Posted 2/14/2008
In Process
135 8502008HW0039P Resident Engineering Inspection Services for School Safety Improvement,Phase II Citywide
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
Addendum 1, Posted 1/14/2008
MWBE Goals, Posted 1/16/2008
Final List
136 8502008VP0003P HWCARRC02, Requirements Contract for Professional Services for Appraisal for Various Projects, Citywide Final List
137 8502008VP0002P TITLE SEARCH REQUIREMENT CONTRACT - CITYWIDE Final List
138 8502008HW0014P RESIDENT ENGINEERING INSPECTION SERVICES FOR THE RECONSTRUCTION OF FULTON STREET
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
Final List
139 8502008HW0016P RESIDENT ENGINEERING INSPECTION SERVICES FOR THE RECONSTRUCTION OF HARRISON STREET, BOROUGH OF MANHATTAN Final List
140 8502007VP0117P
8502007VP0118P
V.C.P., Requirements Contract for Landscape Architecture, Site Engineering and Construction Related Services
Addendum 1, Posted 9/17/2007
Minutes of Pre-Proposal Conference, Posted 10/3/2007
Final List
141 8502008HW0008P HWM1159, Resident Engineering Inspection Services for the Cobblestone Reconstruction of Peck Slip, Borough of Manhattan
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
Final List
142 8502007PW0008P CM/Design/Build for City-Owned Petroleum Contaminated Sites.
Addendum 1, Posted 8/2/2007
Final List
143 8502007SE0041P Resident Engineering Inspection Services for Storm & Sanitary Sewer in 110TH Street, Borough of Queens
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 6/29/2007
Final List
144 8502007CT0007P CO281K-CR, Kings County Criminal Court Building Renovation, Borough of Brooklyn
MWBE Goals, Posted 5/23/2007
Addendum 1, Posted 6/12/2007 (Minutes of Pre-Proposal Conference)
Final List
145 8502007PD0008P PO205-PA , Consultant for Architectural, Engineering Design and Services during Construction for New Police Academy
New Police Academy Location Map, Posted 5/24/2007
Minutes of Pre-Proposal Conference, Posted 6/12/2007
Final List
146 8502007HW0072P REI Services for Improvements to Hylan Boulevard Intersection, Staten Island
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment
MWBE Goals, Posted 5/7/2007
Addendum 1, Posted 5/11/2007
In Process
147 8502007WM0008P REI SERVICES FOR TRUNK WATER MAIN REPLACEMENT IN CLOVE ROAD BETWEEN NARROWS ROAD NORTH AND SILVER LAKE GOLF COURSE, STATEN ISLAND
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 4/17/2007
Final List
148 8502007PD0007P NYPD/FDNY Public Safety Answering Center II (PSAC II), Borough of the Bronx
PSAC II Location Map, Posted 4/17/2007
Addendum 1, Posted 5/10/2007 (Minutes of May 1 Pre-Proposal Conference included)
Final List
149 8502007SE0020P REI Services for the Construction of Sanitary Sewers in Nashville Avenue, Staten Island
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 4/4/2007
Addendum 1, Posted 4/6/2007 (Cancellation Notice)
In Process
150 8502007SE0019P REI SERVICES FOR SEWER AND WATER MAIN WORK IN RICHMOND TERRACE, BOROUGH OF STATEN ISLAND
The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment.
MWBE Goals, Posted 4/2/2007
In Process
151 8502007PW0004P PW311GENV Requirements Contract for Professional Services for Environmental and Geotechnical Services for Various Capital Projects, Citywide
MWBE Goals, Posted 3/27/2007
Addendum 1, Posted 4/19/2007 (Minutes of Pre-Proposal Conference)
Final List
152 8502007HW0068P HWQP168 REI Services for the Reconstruction of 47TH Avenue, Queens
MWBE Goals, Posted 3/21/2007
Addendum 1, Posted 3/29/2007
Addendum 2, Posted 4/5/2007
Final List
153 8502007SE0018P REI SERVICES FOR THE CONSTRUCTION OF SEWERS & BMP WORK IN NORTH RAILROAD STREET, ETC., BOROUGH OF STATEN ISLAND
MWBE Goals, Posted 3/12/2007
Addendum 1, Posted 3/29/2007
Final List
154 8502007HW0042P
8502007HW0043P
8502007HW0044P
8502007HW0045P
RESIDENT ENGINEERING INSPECTION SERVICES FOR PRIOR NOTICE SIDEWALKS IN THE BOROUGHS OF QUEENS, BROOKLYN, MANHATTAN AND THE BRONX
Addendum 1, Posted 3/19/2007
MWBE Goals, Posted 3/19/2007
Final List
155 8502007VP0114P ENGINSP3, Requirements Contract for Engineering Services for Inspection & Material Testing of Water Main & Sewer Pipes and Appurtenances for Various Sites
Addendum 1, Posted 3/16/2007 (Minutes of Pre-Proposal Conference)
Final List
156 8502007HW0063P REI SERVICES FOR THE RECONSTRUCTION OF W 181ST STREET/RIVERSIDE DRIVE RETAINING WALL
MWBE Goals, Posted 2/14/2007
Addendum 1, Posted 3/13/2007 (Cancellation Notice)
In Process
157 8502007WM0004P REI Services for Madison Avenue Trunk Mains - Phase B Lining of 48" Water main & Reconstruction of Distribution Main on
(The preliminary contract plans are now available for review. Please contact the designated contract manager for an appointment.)

MWBE Goals, Posted 1/30/2007
Final List
158 8502007HW0048P HWCRWALLD, Requirements Contract for Engineering Design and Related Services for Retaining Walls, Citywide
MWBE Goals, Posted 1/19/2007
Addendum 1, Posted 2/12/2007
Final List
159
8502007RQ0008P
8502007RQ0009P
8502007RQ0010P
8502007RQ0011P
8502007RQ0012P
8502007RQ0013P
8502007RQ0014P
8502007RQ0015P
Structures, Eight Construction Management Services Requirements Contracts 1 of 8
Addendum 1, Posted 1/25/2007
Addendum 2, Posted 2/14/2007
Pre-Proposal Conference List of Attendees, Posted 2/14/2007
Addendum 3, Posted 2/27/2007
Pre-Proposal Conference Minutes, Posted 2/27/2007
Final List
160 8502007HW0062P City Lights Streetlight Design, Fabrication and Testing of Prototypes
SR-Appendix I - Design-Range, Posted 1/25/2007
SR-Appendix II - Design-Intent, Posted 1/25/2007
Please view 2004 City Lights Competition History, Posted 2/1/2007
Addendum 1, Posted 2/15/2007
Pre-Proposal Conference Minutes, Posted 2/15/2007
Final List
161 8502007HW0006P Resident Engineering Services for the Reconstruction of Beekman Street
Addendum 1, Posted 11/9/2006 (Contract Plans available)
Addendum 2, Posted 11/29/2006
Addendum 3, Posted 11/29/2006
Final List
162
8502007VP0106P
8502007VP0107P
8502007VP0108P
8502007VP0109P
8502007VP0110P
8502007VP0111P
8502007VP0112P
8502007VP0113P
Architectural and Engineering Design Requirements Contract for 8 Large Projects
Addendum 1, Posted 11/21/2006 (Minutes of Pre-Proposal Conference of 11/13/06)
Final List
163
8502007VP0082P
8502007VP0083P
8502007VP0084P
8502007VP0085P
8502007VP0086P
8502007VP0087P
8502007VP0088P
8502007VP0089P
8502007VP0090P
8502007VP0091P
8502007VP0092P
8502007VP0093P
8502007VP0094P
8502007VP0095P
8502007VP0096P
8502007VP0097P
8502007VP0098P
8502007VP0099P
8502007VP0100P
8502007VP0101P
8502007VP0102P
8502007VP0103P
8502007VP0104P
8502007VP0105P
Architectural/Engineering Design Requirements Contract for 24 Small Projects
Addendum 1, Posted 11/21/2006 (Minutes of Pre-Proposal Conference of 11/13/06)
Final List
164 8502007HW0005P Requirements Contract for Resident Engineering Services for Citywide Milling - Boroughs of Brooklyn & Staten Island Final List
165 8502007VP0001P Contract for Counsultant Services for Job Order Contracting System
Addendum 1, Posted 9/28/2006 (Minutes of Pre-Proposal Conference of 9/26/06)
Addendum 2, Posted 10/6/2006 (Clarification of Information)
Final List
166 8502006FI0003P CM/Build for the Construction of a New FDNY Emergency Mgmt. Service Station, Queens
Addendum 1, Posted 9/21/2006 ((Minutes of Pre-Proposal Conference of 9/19/2006))
Final List
167 8502007RQ0001P
8502007RQ0002P
8502007RQ0003P
8502007RQ0004P
8502007RQ0005P
Requirements Contract for Arboricultural Services for Various Projects
Addendum 1, Posted 9/14/2006
In Process
168 8502006FI0002P Construction Management/Build Services for Rescue 3 Company Firehouse
Addendum 1, Posted 9/1/2006 (8/28/2006 Meeting Minutes)
Final List
169 8502006VP0014P Requirements Contract for Resident Engineering Inspection Services for the Reconstruction of Retaining Walls, Citywide
Addendum 1, Posted 8/24/2006 (MWBEs Participation Goals)
Addendum 2, Posted 9/7/2006 (Minutes for Pre-Proposal Conference of 8/30/2006)
Final List
170 8502006VP0012P
8502006VP0013P
RQ-A7E, Requirements Contract for Architectural, Engineering and Construction Related Services for HVAC, Fire Protection, Electrical and Plumbing Design Services, Citywide
Addendum 1, Posted 7/6/2006 (Additional information (06/27/2006 meeting minutes))
Final List
171 8502006HL0005P HH115EAUC, Construction Management/Build Services for a New Family Intake Center (NFIC) for the Department of the Homeless Services, Borough of the Bronx
Addendum 1, Posted 5/10/2006 (5/2/06 Meeting Minutes)
Final List
172 8502006HW0079P HW2CR06CW, Resident Engineering Inspection Services for Citywide Milling Contract Final List
173 8502006PK0001P Architectural and Engineering Design Requirements Contract for the Renovation of Various Stadia Projects
Addendum 1, Posted 3/20/2006 (3/9/06 Meeting Minutes)
Addendum 2, Posted 3/24/2006
Addendum 3, Posted 4/3/2006 (Due Date April 10, 2006)
In Process
174 8502006HW0072P Resident Engineering Inspection Services for Prior Notice Sidewalks, Citywide
Addendum 1, Posted 2/24/2006
Final List
175 8502006HW0070P Resident Engineering Inspection Services for the Reconstruction of Havemeyer Avenue Area, Borough of the Bronx In Process
176 8502006HW0069P Resident Engineering Inspection Services for the Reconstruction of Paulding Avenue Area, Phase 1, Borough of the Bronx
Addendum 1, Posted 2/13/2006
Final List
177 8502006HW0059P
8502006HW0060P
8502006HW0061P
Requirements Contract for Arboricultural Services for Various Projects
Addendum 1, Posted 1/24/2006
Addendum 2, Posted 2/7/2006
In Process
178 8502006IN0065P
8502006IN0066P
8502006IN0067P
Consultant Design and Construction Support Services - 15 Pedestrian Bridges in the Bronx, Queens, Manhattan and Brooklyn Final List
179 8502006PW0010P
8502006PW0011P
8502006PW0012P
8502006PW0013P
8502006PW0014P
SER-SURV6, SEQ-SURV7, SEN-SURV3, SEK-SURV3, SEX-SURV3, Requirements Contract for Surveying Services for the Preparation of Survey Documents for Various Projects in the Boroughs of Staten Island, Queens, Manhattan, Brooklyn and the Bronx
Addendum 1, Posted 2/6/2006 (1/31/06 Meeting Minutes)
Final List
180 8502006HW0063P HWP2006QC, Resident Engineering Inspection Services for the Construction of Complex Pedestrian Ramps, Borough of Queens Final List
181 8502006HW0050P HWP2006KC, Resident Engineering Inspection Services for the Construction of Complex Pedestrian Ramps at Designated Locations, Borough of Brooklyn Final List
182 8502006HW0053P HWQ248D, Resident Engineering Inspection Services for the Reconstruction of Jamaica Avenue Area, Borough of Queens Final List
183 8502006SE0015P SE-777, Resident Engineering Inspection Services for Construction of Sanitary and Storm Sewers and Best Management Practice (BMP) Structures in North Railroad Street, Borough of Staten Island In Process
184 8502006HW0037P HWX733BW, Resident Engineeering Inspection Services for the Reconstruction of East 148 Street, From Exterior Street to Ajgrifin Street, Borough of the Bronx Final List
185 8502006HW0038P HWX211T5B, Resident Engineering Inspection Services for the Reconstruction of Step Streeet at East 183rd Street, Borough of the Bronx Final List
186 8502006HW0039P HWX709, Resident Engineering Inspection Services for the Reconstruction of Ely Avenue Area, Borough of the Bronx
Addendum 1, Posted 12/9/2005
Final List
187 8502006HW0040P HWP2006XC, Resident Engineering Inspection Services for the Construction of Complex Pedestrian Ramps, Borough of the Bronx
Addendum 1, Posted 12/9/2005
Final List
188 8502006HW0048P HWP2006R, Resident Engineering Inspection Services for the Construction of Standard/Non-Complex Pedestrian Ramps at Various Locations, Borough of Staten Island Final List
189 8502006HW0049P HWK973, Resident Engineering Inspection Services for the Reconstruction of Fulton Street, Brough of Brooklyn Final List
190 8502006HW0041P
8502006HW0043P
8502006HW0044P
8502006HW0045P
8502006HW0046P
Resident Engineering Inspection Services for the Construction of Sidewalks at Various Locations in Queens, Brooklyn, Manhattan, the Bronx and Staten Island Final List
191 8502006HW0027P HWQ1161, Resident Engineering Inspection Services for the Reconstruction of 99th and 110th Avenues, Borough of Queens Final List
192 8502006HW0029P HWK1166, Resident Engineering Inspection Services for the Reconstruction of 86th Street from Shore Road to Gatling Place, Borough of Brooklyn Final List
193 8502006IN0001P PV490SITE, Consultant Services for Site Planning and Construction-Related Services for Snug Harbor Land Use Plan and Phase 1 Contruction Project
Addendum 1, Posted 11/21/2005
Final List
194 8502006PW0001P
8502006PW0002P
8502006PW0003P
8502006PW0004P
8502006PW0005P
Requirements Contract for Surveying Services for the Preparation of Survey Documents for Various Projects in the Boroughs of the Bronx, Staten Island, Brooklyn, Manhattan and Queens
Addendum 1, Posted 9/19/2005 (Additional Information - 09/14/2005 Meeting Minutes)
Final List
195 8502005HW0062P HWQ724W, Resident Engineering Inspection Services for the Reconstruction of Brookville Blvd. Area, Borough of Queens
Addendum 1, Posted 8/16/2005
Final List
196 8502005SE0058P SER002271, Resident Engineering Inspection Services for the Construction of Sanitary & Storm Sewers and Best Management Practice (BMP) Structures in Lemon Creek Watershed Area, Borough of Staten Island. In Process
197 8502005WM0007P RED-362, Resident Engineering Inspection Services and Related Services for the Distribution Water Main Extensions/Replacement (New Buildings), Boroughs of Staten Island and Brooklyn. Final List
198 8502005RQ0004P
8502005RQ0005P
A&E Design Requirements. Contract for Commissioning Services Final List
199 8502005HW0043P REI Services for the Construction of Roadways, Water Main, Sewer, Traffic and Street Lighting in Gateway Estates Area Phase 1B, Borough of Brooklyn Final List
200 8502005SE0027P REI Services for the Construction of Sanitary and Storm Sewers, and Water Mains in Harold Street, Borough of Staten Island
Addendum 1, Posted 3/2/2005 (Original 03/08/2005 due Date extended to 03/15/2005)
Final List
201 8502005HW0038P REI Services for the Construction of Citywide Pedestrian Ramps in the Borough of Queens Final List
202 8502005HW0035P REI Services for the Reconstruction of Havemeyer Avenue, Bronx
Addendum 1, Posted 2/8/2005
Final List
203 8502005SE0018P REI Services for the Construction of Sanitary & Storm Sewers in Rossville Ave, S.I. Final List
204 8502005HW0032P REI Services for the Reconstruction of Columbia Street, Brooklyn Final List
205 8502005HW0024P REI Services for the Reconstruction of 32nd Street, Queens Final List
206 8502005IN0001P DEP Remsen Avenue Repair Facility Reconstruction Final List
207
8502005IN0012P
8502005IN0013P
8502005IN0014P
8502005IN0015P
8502005IN0016P
8502005IN0017P
8502005IN0018P
8502005IN0019P
8502005IN0020P
8502005IN0021P
8502005IN0022P
8502005IN0023P
8502005IN0024P
8502005IN0025P
8502005IN0026P
8502005IN0027P
8502005IN0028P
8502005IN0029P
8502005IN0030P
8502005IN0031P
8502005IN0032P
8502005IN0033P
8502005IN0034P
8502005IN0035P
Arch. and Eng. Services for Small Projects within the Structures Division Final List
208
8502005IN0004P
8502005IN0005P
8502005IN0006P
8502005IN0007P
8502005IN0008P
8502005IN0009P
8502005IN0010P
8502005IN0011P
Arch. and Eng. Services for Generic Projects within the Structures Division Final List



Copyright 2008 The City of New York Contact Us | FAQs | Privacy Statement | Site Map