The City of New York is committed to achieving excellence in the design and
construction of its capital program, and building on the tradition of
innovation in architecture and engineering that has contributed to the City's
prestige as a global destination. As part of this effort, DDC is pleased to
announce the following contracting opportunites:
| # |
 |
PIN |
 |
RFP |
 |
SELECTED FIRMS |
| 1 |
 |
8502008PW0013P |
 |
Requirements Contract for Geotechnical Inspection Services, Citywide Addendum 1, Posted 8/22/2008 Minutes of August 18, 2008 Pre-Proposal Conference, Posted 8/22/2008 |
 |
In Process |
| 2 |
 |
8502008CR0017P |
 |
Consultant for Architectural, Engineering Design and Services during Construction for James A. Thomas Center, Reconstruction Phase II, Rikers Island MWBE Goals, Posted 6/23/2008 Minutes of July 11, 2008, Posted 7/18/2008 Addendum 1, Posted 7/18/2008 |
 |
In Process |
| 3 |
 |
8502008RQ0033P |
 |
8502008RQ00033-34P – Requirements Contract for Historic Preservation Design, Architecture, Engineering and Construction Related Services, Citywide MWBE Goals, Posted 6/9/2008 Minutes of June 24, 2008 Pre-Proposal Conference, Posted 7/3/2008 Addendum 1, Posted 7/3/2008 |
 |
In Process |
| 4 |
 |
8502008RQ0006P |
 |
Requirements Contracts for Resident Engineering Inspection Services for Twelve Contracts, Citywide MWBE Goals, Posted 6/3/2008 Addendum 1, Posted 6/24/2008 |
 |
In Process |
| 5 |
 |
8502008PD0009P |
 |
Construction Management/ Build Services for the Construction of the New Police Academy, Borough of Queens Pre-Proposal Conference Minutes, Posted 6/10/2008 |
 |
Short List |
| 6 |
 |
8502008RQ0032P |
 |
Requirements Contract for Environmental Services for Various Capital Projects Citywide MWBE Goals, Posted 4/2/2008 Addendum 1, Posted 4/11/2008 Addendum 2, Posted 4/28/2008 Minutes of 4/17 Pre-Proposal Conference, Posted 4/28/2008 Addendum 3, Posted 4/30/2008 |
 |
In Process |
| 7 |
 |
8502008PW0006P |
 |
Requirements Contract for Environmental Services for Various Capital Projects, Citywide MWBE Goals, Posted 4/9/2008 Minutes of 4/17 Pre-Proposal Conference, Posted 4/28/2008 Addendum 1, Posted 5/1/2008 |
 |
In Process |
| 8 |
 |
8502008VP0009P |
 |
Requirements Contracts for Building Envelope Design, Engineering and Construction Related Services Addendum 1, Posted 4/24/2008 Minutes of 4/21/08 Pre-Proposal Conference, Posted 4/24/2008 |
 |
In Process |
| 9 |
 |
8502008HW0045P |
 |
Design of Hudson Park and Boulevard and Streetscape for Hudson Yards Area Addendum 1, Posted 4/2/2008 Addendum 2, Posted 4/7/2008 Addendum 3, Posted 4/16/2008 Minutes of 4/8 Pre-Proposal Conference, Posted 4/16/2008 |
 |
In Process |
| 10 |
 |
8502008RQ0023P |
 |
Eight Engineering Design and Related Services Requirements Contracts, Citywide MWBE Goals, Posted 3/24/2008 Addendum 1, Posted 4/15/2008 Minutes of 4/8 Pre-Proposal Conference, Posted 4/15/2008 |
 |
In Process |
| 11 |
 |
8502008HW0052P |
 |
Resident Engineering Inspection Services for Milling Projects Involving Grinding Existing Asphaltic Concrete Wearing Courses for the Boroughs of Brooklyn, Staten Island, Manhattan, the Bronx and Queens MWBE Goals, Posted 3/20/2008 |
 |
In Process |
| 12 |
 |
8502008FI0001P |
 |
Construction Management/ Build Services for the Construction of New Emergency Medical Service Station, Borough of the Bronx Addendum 1, Posted 4/4/2008 Minutes Pre-Proposal Conference, Posted 4/4/2008 |
 |
In Process |
| 13 |
 |
8502008HW0040P |
 |
Resident Engineering Inspection Services for Prior Notice Sidewalks for the Boroughs of Queens, Brooklyn, the Bronx and Manhattan MWBE Goals, Posted 3/17/2008 |
 |
In Process |
| 14 |
 |
8502008PD0002P |
 |
Construction Management/ Build Services for the Construction of the NYPD/FDNY/DoITT Public Safety Answering Center II (PSACII), Borough of the Bronx Addendum 1, Posted 3/20/2008 Addendum 2, Posted 3/27/2008 Addendum 3, Posted 4/10/2008 Minutes of 4/2/08 Pre-Proposal Conference, Posted 4/10/2008 |
 |
In Process |
| 15 |
 |
8502008CR0014P |
 |
Renovation and Expansion of the Brooklyn Detention Center, Borough of Brooklyn MWBE Goals, Posted 3/13/2008 Addendum 1, Posted 3/21/2008 Addendum 2, Posted 4/2/2008 Pre-Proposal Conference Notes, Posted 4/2/2008 Addendum 3, Posted 4/7/2008 |
 |
In Process |
| 16 |
 |
8502008PD0008P |
 |
Construction of New 121st Street Precinct, STATEN ISLAND Minutes of Pre-Proposal Conference, Posted 4/1/2008 Addendum 1, Posted 4/1/2008 |
 |
In Process |
| 17 |
 |
8502008HW0055P |
 |
HW2CR08CW, Resident Engineering Inspection Services for Milling, Citywide MWBE Goals, Posted 3/3/2008 |
 |
In Process |
| 18 |
 |
8502008VP0011P |
 |
Requirements Contract for Forensic Engineering and Construction Related Services for Building Systems, Citywide Addendum 1, Posted 3/4/2008 Minutes of Pre-Proposal Meeting-March 10, 2008, Posted 3/18/2008 |
 |
In Process |
| 19 |
 |
8502008RQ0031P |
 |
RQ_PO, Requirements Contract for Cost Management and Cost Estimating Services for Various Projects, Citywide Addendum 1, Posted 3/11/2008 Addendum 2, Posted 3/20/2008 |
 |
In Process |
| 20 |
 |
8502008HW0050P |
 |
REI SERVICES FOR THE RECONSTRUCTION OF WEST 33RD STREET BETWEEN 10TH AVE & 11TH AVE The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 1/22/2008 Addendum 1, Posted 2/14/2008 |
 |
In Process |
| 21 |
 |
8502008HW0039P |
 |
Resident Engineering Inspection Services for School Safety Improvement,Phase II Citywide The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. Addendum 1, Posted 1/14/2008 MWBE Goals, Posted 1/16/2008 |
 |
In Process |
| 22 |
 |
8502008VP0003P |
 |
HWCARRC02, Requirements Contract for Professional Services for Appraisal for Various Projects, Citywide |
 |
In Process |
| 23 |
 |
8502008VP0002P |
 |
TITLE SEARCH REQUIREMENT CONTRACT - CITYWIDE |
 |
Final List |
| 24 |
 |
8502008HW0014P |
 |
RESIDENT ENGINEERING INSPECTION SERVICES FOR THE RECONSTRUCTION OF FULTON STREET The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. |
 |
In Process |
| 25 |
 |
8502008HW0016P |
 |
RESIDENT ENGINEERING INSPECTION SERVICES FOR THE RECONSTRUCTION OF HARRISON STREET, BOROUGH OF MANHATTAN |
 |
In Process |
| 26 |
 |
8502007VP0117P 8502007VP0118P |
 |
V.C.P., Requirements Contract for Landscape Architecture, Site Engineering and Construction Related Services Addendum 1, Posted 9/17/2007 Minutes of Pre-Proposal Conference, Posted 10/3/2007 |
 |
In Process |
| 27 |
 |
8502008HW0008P |
 |
HWM1159, Resident Engineering Inspection Services for the Cobblestone Reconstruction of Peck Slip, Borough of Manhattan The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. |
 |
In Process |
| 28 |
 |
8502007PW0008P |
 |
CM/Design/Build for City-Owned Petroleum Contaminated Sites. Addendum 1, Posted 8/2/2007 |
 |
Final List |
| 29 |
 |
8502007SE0041P |
 |
Resident Engineering Inspection Services for Storm & Sanitary Sewer in 110TH Street, Borough of Queens The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 6/29/2007 |
 |
In Process |
| 30 |
 |
8502007CT0007P |
 |
CO281K-CR, Kings County Criminal Court Building Renovation, Borough of Brooklyn MWBE Goals, Posted 5/23/2007 Addendum 1, Posted 6/12/2007 (Minutes of Pre-Proposal Conference) |
 |
In Process |
| 31 |
 |
8502007PD0008P |
 |
PO205-PA , Consultant for Architectural, Engineering Design and Services during Construction for New Police Academy New Police Academy Location Map, Posted 5/24/2007 Minutes of Pre-Proposal Conference, Posted 6/12/2007 |
 |
Short List |
| 32 |
 |
8502007HW0072P |
 |
REI Services for Improvements to Hylan Boulevard Intersection, Staten Island The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment MWBE Goals, Posted 5/7/2007 Addendum 1, Posted 5/11/2007 |
 |
In Process |
| 33 |
 |
8502007WM0008P |
 |
REI SERVICES FOR TRUNK WATER MAIN REPLACEMENT IN CLOVE ROAD BETWEEN NARROWS ROAD NORTH AND SILVER LAKE GOLF COURSE, STATEN ISLAND The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 4/17/2007 |
 |
Final List |
| 34 |
 |
8502007PD0007P |
 |
NYPD/FDNY Public Safety Answering Center II (PSAC II), Borough of the Bronx PSAC II Location Map, Posted 4/17/2007 Addendum 1, Posted 5/10/2007 (Minutes of May 1 Pre-Proposal Conference included) |
 |
Final List |
| 35 |
 |
8502007SE0020P |
 |
REI Services for the Construction of Sanitary Sewers in Nashville Avenue, Staten Island The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 4/4/2007 Addendum 1, Posted 4/6/2007 (Cancellation Notice) |
 |
In Process |
| 36 |
 |
8502007SE0019P |
 |
REI SERVICES FOR SEWER AND WATER MAIN WORK IN RICHMOND TERRACE, BOROUGH OF STATEN ISLAND The design plans for the project listed are now available for review. Please contact the designated contract manager for an appointment. MWBE Goals, Posted 4/2/2007 |
 |
In Process |
| 37 |
 |
8502007PW0004P |
 |
PW311GENV Requirements Contract for Professional Services for Environmental and Geotechnical Services for Various Capital Projects, Citywide MWBE Goals, Posted 3/27/2007 Addendum 1, Posted 4/19/2007 (Minutes of Pre-Proposal Conference) |
 |
Final List |
| 38 |
 |
8502007HW0068P |
 |
HWQP168 REI Services for the Reconstruction of 47TH Avenue, Queens MWBE Goals, Posted 3/21/2007 Addendum 1, Posted 3/29/2007 Addendum 2, Posted 4/5/2007 |
 |
Final List |
| 39 |
 |
8502007SE0018P |
 |
REI SERVICES FOR THE CONSTRUCTION OF SEWERS & BMP WORK IN NORTH RAILROAD STREET, ETC., BOROUGH OF STATEN ISLAND MWBE Goals, Posted 3/12/2007 Addendum 1, Posted 3/29/2007 |
 |
Final List |
| 40 |
 |
8502007HW0042P 8502007HW0043P 8502007HW0044P 8502007HW0045P |
 |
RESIDENT ENGINEERING INSPECTION SERVICES FOR PRIOR NOTICE SIDEWALKS IN THE BOROUGHS OF QUEENS, BROOKLYN, MANHATTAN AND THE BRONX Addendum 1, Posted 3/19/2007 MWBE Goals, Posted 3/19/2007 |
 |
Final List |
| 41 |
 |
8502007VP0114P |
 |
ENGINSP3, Requirements Contract for Engineering Services for Inspection & Material Testing of Water Main & Sewer Pipes and Appurtenances for Various Sites Addendum 1, Posted 3/16/2007 (Minutes of Pre-Proposal Conference) |
 |
Final List |
| 42 |
 |
8502007HW0063P |
 |
REI SERVICES FOR THE RECONSTRUCTION OF W 181ST STREET/RIVERSIDE DRIVE RETAINING WALL MWBE Goals, Posted 2/14/2007 Addendum 1, Posted 3/13/2007 (Cancellation Notice) |
 |
In Process |
| 43 |
 |
8502007WM0004P |
 |
REI Services for Madison Avenue Trunk Mains - Phase B Lining of 48" Water main & Reconstruction of Distribution Main on (The preliminary contract plans are now available for review. Please contact the designated contract manager for an appointment.) MWBE Goals, Posted 1/30/2007 |
 |
Final List |
| 44 |
 |
8502007HW0048P |
 |
HWCRWALLD, Requirements Contract for Engineering Design and Related Services for Retaining Walls, Citywide MWBE Goals, Posted 1/19/2007 Addendum 1, Posted 2/12/2007 |
 |
Final List |
| 45 |
 |
8502007RQ0008P 8502007RQ0009P 8502007RQ0010P 8502007RQ0011P 8502007RQ0012P 8502007RQ0013P 8502007RQ0014P 8502007RQ0015P |
 |
Structures, Eight Construction Management Services Requirements Contracts 1 of 8 Addendum 1, Posted 1/25/2007 Addendum 2, Posted 2/14/2007 Pre-Proposal Conference List of Attendees, Posted 2/14/2007 Addendum 3, Posted 2/27/2007 Pre-Proposal Conference Minutes, Posted 2/27/2007 |
 |
Final List |
| 46 |
 |
8502007HW0062P |
 |
City Lights Streetlight Design, Fabrication and Testing of Prototypes SR-Appendix I - Design-Range, Posted 1/25/2007 SR-Appendix II - Design-Intent, Posted 1/25/2007 Please view 2004 City Lights Competition History, Posted 2/1/2007 Addendum 1, Posted 2/15/2007 Pre-Proposal Conference Minutes, Posted 2/15/2007 |
 |
In Process |
| 47 |
 |
8502007HW0006P |
 |
Resident Engineering Services for the Reconstruction of Beekman Street Addendum 1, Posted 11/9/2006 (Contract Plans available) Addendum 2, Posted 11/29/2006 Addendum 3, Posted 11/29/2006 |
 |
Final List |
| 48 |
 |
8502007VP0106P 8502007VP0107P 8502007VP0108P 8502007VP0109P 8502007VP0110P 8502007VP0111P 8502007VP0112P 8502007VP0113P |
 |
Architectural and Engineering Design Requirements Contract for 8 Large Projects Addendum 1, Posted 11/21/2006 (Minutes of Pre-Proposal Conference of 11/13/06) |
 |
Final List |
| 49 |
 |
8502007VP0082P 8502007VP0083P 8502007VP0084P 8502007VP0085P 8502007VP0086P 8502007VP0087P 8502007VP0088P 8502007VP0089P 8502007VP0090P 8502007VP0091P 8502007VP0092P 8502007VP0093P 8502007VP0094P 8502007VP0095P 8502007VP0096P 8502007VP0097P 8502007VP0098P 8502007VP0099P 8502007VP0100P 8502007VP0101P 8502007VP0102P 8502007VP0103P 8502007VP0104P 8502007VP0105P |
 |
Architectural/Engineering Design Requirements Contract for 24 Small Projects Addendum 1, Posted 11/21/2006 (Minutes of Pre-Proposal Conference of 11/13/06) |
 |
Final List |
| 50 |
 |
8502007HW0005P |
 |
Requirements Contract for Resident Engineering Services for Citywide Milling - Boroughs of Brooklyn & Staten Island |
 |
Final List |
| 51 |
 |
8502007VP0001P |
 |
Contract for Counsultant Services for Job Order Contracting System Addendum 1, Posted 9/28/2006 (Minutes of Pre-Proposal Conference of 9/26/06) Addendum 2, Posted 10/6/2006 (Clarification of Information) |
 |
Final List |
| 52 |
 |
8502006FI0003P |
 |
CM/Build for the Construction of a New FDNY Emergency Mgmt. Service Station, Queens Addendum 1, Posted 9/21/2006 ((Minutes of Pre-Proposal Conference of 9/19/2006)) |
 |
Final List |
| 53 |
 |
8502007RQ0001P 8502007RQ0002P 8502007RQ0003P 8502007RQ0004P 8502007RQ0005P |
 |
Requirements Contract for Arboricultural Services for Various Projects Addendum 1, Posted 9/14/2006 |
 |
In Process |
| 54 |
 |
8502006FI0002P |
 |
Construction Management/Build Services for Rescue 3 Company Firehouse Addendum 1, Posted 9/1/2006 (8/28/2006 Meeting Minutes) |
 |
Final List |
| 55 |
 |
8502006VP0014P |
 |
Requirements Contract for Resident Engineering Inspection Services for the Reconstruction of Retaining Walls, Citywide Addendum 1, Posted 8/24/2006 (MWBEs Participation Goals) Addendum 2, Posted 9/7/2006 (Minutes for Pre-Proposal Conference of 8/30/2006) |
 |
Final List |
| 56 |
 |
8502006VP0012P 8502006VP0013P |
 |
RQ-A7E, Requirements Contract for Architectural, Engineering and Construction Related Services for HVAC, Fire Protection, Electrical and Plumbing Design Services, Citywide Addendum 1, Posted 7/6/2006 (Additional information (06/27/2006 meeting minutes)) |
 |
Final List |
| 57 |
 |
8502006HL0005P |
 |
HH115EAUC, Construction Management/Build Services for a New Family Intake Center (NFIC) for the Department of the Homeless Services, Borough of the Bronx Addendum 1, Posted 5/10/2006 (5/2/06 Meeting Minutes) |
 |
Final List |
| 58 |
 |
8502006HW0079P |
 |
HW2CR06CW, Resident Engineering Inspection Services for Citywide Milling Contract |
 |
Final List |
| 59 |
 |
8502006PK0001P |
 |
Architectural and Engineering Design Requirements Contract for the Renovation of Various Stadia Projects Addendum 1, Posted 3/20/2006 (3/9/06 Meeting Minutes) Addendum 2, Posted 3/24/2006 Addendum 3, Posted 4/3/2006 (Due Date April 10, 2006) |
 |
In Process |
| 60 |
 |
8502006HW0072P |
 |
Resident Engineering Inspection Services for Prior Notice Sidewalks, Citywide Addendum 1, Posted 2/24/2006 |
 |
Final List |
| 61 |
 |
8502006HW0070P |
 |
Resident Engineering Inspection Services for the Reconstruction of Havemeyer Avenue Area, Borough of the Bronx |
 |
In Process |
| 62 |
 |
8502006HW0069P |
 |
Resident Engineering Inspection Services for the Reconstruction of Paulding Avenue Area, Phase 1, Borough of the Bronx Addendum 1, Posted 2/13/2006 |
 |
Final List |
| 63 |
 |
8502006HW0059P 8502006HW0060P 8502006HW0061P |
 |
Requirements Contract for Arboricultural Services for Various Projects Addendum 1, Posted 1/24/2006 Addendum 2, Posted 2/7/2006 |
 |
In Process |
| 64 |
 |
8502006IN0065P 8502006IN0066P 8502006IN0067P |
 |
Consultant Design and Construction Support Services - 15 Pedestrian Bridges in the Bronx, Queens, Manhattan and Brooklyn |
 |
Final List |
| 65 |
 |
8502006PW0010P 8502006PW0011P 8502006PW0012P 8502006PW0013P 8502006PW0014P |
 |
SER-SURV6, SEQ-SURV7, SEN-SURV3, SEK-SURV3, SEX-SURV3, Requirements Contract for Surveying Services for the Preparation of Survey Documents for Various Projects in the Boroughs of Staten Island, Queens, Manhattan, Brooklyn and the Bronx Addendum 1, Posted 2/6/2006 (1/31/06 Meeting Minutes) |
 |
Final List |
| 66 |
 |
8502006HW0063P |
 |
HWP2006QC, Resident Engineering Inspection Services for the Construction of Complex Pedestrian Ramps, Borough of Queens |
 |
Final List |
| 67 |
 |
8502006HW0050P |
 |
HWP2006KC, Resident Engineering Inspection Services for the Construction of Complex Pedestrian Ramps at Designated Locations, Borough of Brooklyn |
 |
Final List |
| 68 |
 |
8502006HW0053P |
 |
HWQ248D, Resident Engineering Inspection Services for the Reconstruction of Jamaica Avenue Area, Borough of Queens |
 |
Final List |
| 69 |
 |
8502006SE0015P |
 |
SE-777, Resident Engineering Inspection Services for Construction of Sanitary and Storm Sewers and Best Management Practice (BMP) Structures in North Railroad Street, Borough of Staten Island |
 |
In Process |
| 70 |
 |
8502006HW0037P |
 |
HWX733BW, Resident Engineeering Inspection Services for the Reconstruction of East 148 Street, From Exterior Street to Ajgrifin Street, Borough of the Bronx |
 |
Final List |
| 71 |
 |
8502006HW0038P |
 |
HWX211T5B, Resident Engineering Inspection Services for the Reconstruction of Step Streeet at East 183rd Street, Borough of the Bronx |
 |
Final List |
| 72 |
 |
8502006HW0039P |
 |
HWX709, Resident Engineering Inspection Services for the Reconstruction of Ely Avenue Area, Borough of the Bronx Addendum 1, Posted 12/9/2005 |
 |
Final List |
| 73 |
 |
8502006HW0040P |
 |
HWP2006XC, Resident Engineering Inspection Services for the Construction of Complex Pedestrian Ramps, Borough of the Bronx Addendum 1, Posted 12/9/2005 |
 |
Final List |
| 74 |
 |
8502006HW0048P |
 |
HWP2006R, Resident Engineering Inspection Services for the Construction of Standard/Non-Complex Pedestrian Ramps at Various Locations, Borough of Staten Island |
 |
Final List |
| 75 |
 |
8502006HW0049P |
 |
HWK973, Resident Engineering Inspection Services for the Reconstruction of Fulton Street, Brough of Brooklyn |
 |
Final List |
| 76 |
 |
8502006HW0041P 8502006HW0043P 8502006HW0044P 8502006HW0045P 8502006HW0046P |
 |
Resident Engineering Inspection Services for the Construction of Sidewalks at Various Locations in Queens, Brooklyn, Manhattan, the Bronx and Staten Island |
 |
Final List |
| 77 |
 |
8502006HW0027P |
 |
HWQ1161, Resident Engineering Inspection Services for the Reconstruction of 99th and 110th Avenues, Borough of Queens |
 |
Final List |
| 78 |
 |
8502006HW0029P |
 |
HWK1166, Resident Engineering Inspection Services for the Reconstruction of 86th Street from Shore Road to Gatling Place, Borough of Brooklyn |
 |
Final List |
| 79 |
 |
8502006IN0001P |
 |
PV490SITE, Consultant Services for Site Planning and Construction-Related Services for Snug Harbor Land Use Plan and Phase 1 Contruction Project Addendum 1, Posted 11/21/2005 |
 |
Final List |
| 80 |
 |
8502006PW0001P 8502006PW0002P 8502006PW0003P 8502006PW0004P 8502006PW0005P |
 |
Requirements Contract for Surveying Services for the Preparation of Survey Documents for Various Projects in the Boroughs of the Bronx, Staten Island, Brooklyn, Manhattan and Queens Addendum 1, Posted 9/19/2005 (Additional Information - 09/14/2005 Meeting Minutes) |
 |
Final List |
| 81 |
 |
8502005HW0062P |
 |
HWQ724W, Resident Engineering Inspection Services for the Reconstruction of Brookville Blvd. Area, Borough of Queens Addendum 1, Posted 8/16/2005 |
 |
Final List |
| 82 |
 |
8502005SE0058P |
 |
SER002271, Resident Engineering Inspection Services for the Construction of Sanitary & Storm Sewers and Best Management Practice (BMP) Structures in Lemon Creek Watershed Area, Borough of Staten Island. |
 |
In Process |
| 83 |
 |
8502005WM0007P |
 |
RED-362, Resident Engineering Inspection Services and Related Services for the Distribution Water Main Extensions/Replacement (New Buildings), Boroughs of Staten Island and Brooklyn. |
 |
Final List |
| 84 |
 |
8502005RQ0004P 8502005RQ0005P |
 |
A&E Design Requirements. Contract for Commissioning Services |
 |
Final List |
| 85 |
 |
8502005HW0043P |
 |
REI Services for the Construction of Roadways, Water Main, Sewer, Traffic and Street Lighting in Gateway Estates Area Phase 1B, Borough of Brooklyn |
 |
Final List |
| 86 |
 |
8502005SE0027P |
 |
REI Services for the Construction of Sanitary and Storm Sewers, and Water Mains in Harold Street, Borough of Staten Island Addendum 1, Posted 3/2/2005 (Original 03/08/2005 due Date extended to 03/15/2005) |
 |
Final List |
| 87 |
 |
8502005HW0038P |
 |
REI Services for the Construction of Citywide Pedestrian Ramps in the Borough of Queens |
 |
Final List |
| 88 |
 |
8502005HW0035P |
 |
REI Services for the Reconstruction of Havemeyer Avenue, Bronx Addendum 1, Posted 2/8/2005 |
 |
Final List |
| 89 |
 |
8502005SE0018P |
 |
REI Services for the Construction of Sanitary & Storm Sewers in Rossville Ave, S.I. |
 |
Final List |
| 90 |
 |
8502005HW0032P |
 |
REI Services for the Reconstruction of Columbia Street, Brooklyn |
 |
|